Fast Turnaround Queue Summary : Semester 2020A GN

The tables below summarise the programs that constitute the Fast Turnaround program queue on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2020A-FT-101 Goldstein US Strongly lensed supernovae from ZTF: Time-delays and lensing magnification GNIRS+AltairLGS / NIRI+AltairLGS 4.00
Execution Status: SToO Dates Taken:
Completion Status:
0%
GN-2020A-FT-102 Luhman US Searching for the Least Massive Brown Dwarfs in IC 348 GNIRS 4.30
Execution Status: complete Dates Taken:
20200203 20200205 20200226 20200309
Completion Status:
100%
GN-2020A-FT-103 Hwang US Discovery of mass-dependent gravitational redshifts in white dwarfs GMOS 2.95
Execution Status: Dates Taken:
20200221 20200228 20200303 20200312
Completion Status:
-7%
GN-2020A-FT-104 Carlsten US Characterizing the Dwarf Satellite System of NGC 4631 with GMOS GMOS 2.80
Execution Status: complete Dates Taken:
20200227 20200228 20200306
Completion Status:
100%
GN-2020A-FT-105 Kumari US Preparing for JWST with GMOS-IFU observations of Pox 186: a local analogue of z > 6 galaxies GMOS 3.40
Execution Status: complete Dates Taken:
20200520 20200521 20200524 20200525 20200530 20200601 20200602 20200624
Completion Status:
100%
GN-2020A-FT-106 Matsuoka JP Search for AGN signatures in newly discovered merging galaxies at z = 6.05 GNIRS 4.70
Execution Status: complete Dates Taken:
20200603 20200604 20200613 20200614 20200706 20200707
Completion Status:
100%
GN-2020A-FT-107 Miller US Searching for He in Double Detontation Type Ia Supernovae GNIRS 2.20
Execution Status: SToO Dates Taken:
20200609
Completion Status:
42%
GN Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2020A-FT-201 Spolaor US Improving the redshift of the host to the largest DM localized fast radio burst NIRI 2.20
Execution Status: Dates Taken:
20200309 20200310 20200311
Completion Status:
71%
GN-2020A-FT-202 van Roestel US A new eclipsing AM CVn binary discovered by ZTF Visitor 1.60
Execution Status: complete Dates Taken:
20200216 20200217 20200218
Completion Status:
100%
GN-2020A-FT-203 Yi US Gaining new insight into the origin of weak emission-line quasars GNIRS 2.80
Execution Status: complete Dates Taken:
20200221 20200228 20200306 20200311
Completion Status:
100%
GN-2020A-FT-204 Burke US Origin of the extreme broad emission in three metal-poor galaxies GMOS 2.30
Execution Status: complete Dates Taken:
20200312 20200526 20200529 20200530
Completion Status:
100%
GN-2020A-FT-205 Leggett US Identifying Targets for JWST: the 300K Brown Dwarfs Flamingos2 / NIRI 4.90
Execution Status: Dates Taken:
20200310
Completion Status:
52%

 