[Mayan calendar]

Fast Turnaround Queue Summary : Semester 2017A GN

The tables below summarise the programs that constitute the Fast Turnaround program queue on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2017A-FT-1 Takami JP Understanding the Mechanism of Jet Launching in Active Young Stars NIFS+Altair 4.50
Execution Status: complete Dates Taken:
20170215 20170216 20170217 20170218
Completion Status:
100%
GN-2017A-FT-3 Seth US NGC 3945: Measuring the stellar kinematics and SMBH mass in a prototypical composite-bulge galaxy NIFS+AltairLGS 2.10
Execution Status: Dates Taken:
Completion Status:
0%
GN-2017A-FT-5 Corlies US Investigating seasonal changes in Titan's meteorology through cloud monitoring with NIRI NIRI+Altair 4.20
Execution Status: complete Dates Taken:
20170327 20170330 20170424 20170509 20170511 20170525 20170527 20170529 20170530 20170531 20170601
Completion Status:
100%
GN-2017A-FT-6 Morley US The Second Spectrum of the Coldest Brown Dwarf GNIRS 7.50
Execution Status: complete Dates Taken:
20170304 20170306 20170327 20170328 20170329 20170621
Completion Status:
100%
GN-2017A-FT-9 Treu US A reverberation mapping black hole mass measurement at z=2.82 GMOS 8.00
Execution Status: complete Dates Taken:
20170410 20170411 20170423 20170505 20170523 20170525 20170526 20170621 20170630
Completion Status:
100%
GN-2017A-FT-10 Scharwaechter US Close AGN Reference Survey: AGN feedback in action in HE 1353-1917 NIFS 4.00
Execution Status: complete Dates Taken:
20170406 20170407
Completion Status:
100%
GN-2017A-FT-11 Secrest US Was 49b: The Gemini View GMOS 4.00
Execution Status: complete Dates Taken:
20170402 20170403 20170415 20170417
Completion Status:
100%
GN-2017A-FT-13 Schwamb US Toward Characterizing A New Surface Type in the Kuiper Belt GMOS 2.30
Execution Status: complete Dates Taken:
20170622
Completion Status:
100%
GN-2017A-FT-14 Schimoia BR The first spectroscopic dust reverberation program on a narrow- line Seyfert 1 galaxy: case study Mrk 110 GNIRS 2.40
Execution Status: Dates Taken:
20170505 20170517 20170605
Completion Status:
66%
GN-2017A-FT-15 Nicholl US Nebular spectroscopy of the closest and most UV-luminous superluminous supernova GMOS 2.00
Execution Status: complete Dates Taken:
20170517 20170518
Completion Status:
100%
GN-2017A-FT-16 Thomas-Osip US Mutual event campaign to characterize AIDA target NEA Didymos GMOS 4.10
Execution Status: complete Dates Taken:
20170504
Completion Status:
100%
GN-2017A-FT-20 Jofré AR From stellar chemistry to planetary composition GMOS 1.10
Execution Status: complete Dates Taken:
20170608 20170609
Completion Status:
100%
GN-2017A-FT-21 Blanchard US Chasing Two Superluminous Supernovae Into the Nebular Phase GMOS 2.50
Execution Status: complete Dates Taken:
20170528 20170530 20170601 20170622
Completion Status:
100%
GN-2017A-FT-22 Chilingarian US Internal dynamics and stellar content of a recently formed ultra-diffuse galaxy GMOS 3.70
Execution Status: complete Dates Taken:
20170624 20170625
Completion Status:
100%
GN Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2017A-FT-2 Nicholl US Galactic environments of hydrogen-rich superluminous supernovae GMOS 4.00
Execution Status: Dates Taken:
20170331 20170423 20170426
Completion Status:
0%
GN-2017A-FT-4 Koptelova JP GNIRS spectroscopy of a new z~6.5 quasar selected from PanSTARRs1 GNIRS 1.50
Execution Status: complete Dates Taken:
20170410
Completion Status:
100%
GN-2017A-FT-7 Long US The SNR Population of M51 GMOS 5.30
Execution Status: complete Dates Taken:
20170327 20170402 20170422 20170521 20170528
Completion Status:
100%
GN-2017A-FT-8 Fox US The Nature of the Host Galaxy and Persistent Radio Source Associated with FRB 121102 GMOS 2.20
Execution Status: Dates Taken:
Completion Status:
0%
GN-2017A-FT-12 Luhman US Spectroscopy of Planetary-Mass Brown Dwarf Candidates in Upper Scorpius GNIRS 2.00
Execution Status: complete Dates Taken:
20170326 20170327 20170329 20170406
Completion Status:
100%
GN-2017A-FT-17 Luhman US Searching for the Least Massive Brown Dwarfs in Upper Scorpius GNIRS 2.60
Execution Status: complete Dates Taken:
20170507 20170509 20170512
Completion Status:
100%
GN-2017A-FT-18 Lokhorst CA Confirmation of M101's newly discovered dwarf candidates GMOS 2.00
Execution Status: complete Dates Taken:
20170511 20170513 20170514 20170515 20170517
Completion Status:
100%
GN-2017A-FT-19 Romero BR Spectroscopy and Photometry of the hottest ZZ Ceti HS 1531+7436 GMOS 4.60
Execution Status: complete Dates Taken:
20170527 20170528 20170529 20170530 20170531 20170601
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:36:29 GMT