[Mayan calendar]

Director's Discretionary Time Summary : Semester 2007A GS

The data shown in the tables below summarise the programs that constitute the "Director's Discretionary Time" (DDT) on GS. DDT proposals are typically for time-critical observations which cannot wait for the normal proposal cycle (e.g. unexpected astronomical events) or for testing the feasibility of a technique or of a program. See the DDT web page for more information. DDT proposals may be submitted at any time by any astronomer world-wide.

In other respects - contact scientist support, Phase II definitions, Gemini Science Archive data distribution - DDT programs are similar to other Gemini queue programs.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2007A-DD-2 Michaud The Gemini South legacy images program: PR images for 2007A GMOS-S 6.85
Execution Status: Dates Taken:
20070318 20070320 20070712 20070718 20070719
Completion Status:
70%
GS-2007A-DD-3 Gezari Constraining the MIR emssion of SagittariusA* within a coordinated multi-wavelength campaign TReCS 9.00
Execution Status: complete Dates Taken:
20070523 20070524 20070525 20070526
Completion Status:
100%
GS-2007A-DD-10 Wang Optical colour of the anomalous X-ray pulsar 1E 1048.1-5937: a second case for magnetars GMOS-S 3.00
Execution Status: complete Dates Taken:
20070624 20070715 20070716
Completion Status:
100%
GS-2007A-DD-11 Davidson An Unexpected Event in Eta Carinae GMOS-S 2.50
Execution Status: complete Dates Taken:
20070610 20070612 20070616 20070617 20070618 20070630 20070710 20070711
Completion Status:
100%
GS-2007A-DD-12 Asplund Constraining the Formation of the Galactic Bulge Phoenix 15.00
Execution Status: complete Dates Taken:
20070626 20070627 20070628 20070629
Completion Status:
100%
GS-2007A-DD-16 De Buizer Exploring the relation between Class II methanol masers, disks, and outflows in high-mass star forming regions using infrared interferometry - Gemini support TReCS 0.50
Execution Status: complete Dates Taken:
20070630 20070701
Completion Status:
100%
GS-2007A-DD-99 Miller QPT Timing Constraint Tests GMOS-S 0.00
Execution Status: Dates Taken:
Completion Status:
NaN%
GS Director's Discretionary Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2007A-DD-1 Hinkle Phoenix NGSC support time 2007A Phoenix 23.00
Execution Status: complete Dates Taken:
20070201 20070301 20071203 20071204 20071205
Completion Status:
100%
GS-2007A-DD-4 Gezari Constraining the MIR emssion of SagittariusA* within a coordinated multi-wavelength campaign TReCS 9.00
Execution Status: complete Dates Taken:
20070606 20070607 20070610
Completion Status:
100%
GS-2007A-DD-5 Turner The Supergiant Cannibal in Abell 3827 GMOS-S 5.50
Execution Status: complete Dates Taken:
20070527 20070530 20070603 20070606 20070608 20070621 20070707
Completion Status:
100%
GS-2007A-DD-6 Faundez-Abans Nuclear activity (?) in FM 47-02, a peculiar Ring Galaxy GMOS-S 1.00
Execution Status: complete Dates Taken:
20070606 20070608
Completion Status:
100%
GS-2007A-DD-7 Radomski The Mid-Infrared Mystery of Narrow Line Region AGN TReCS 11.00
Execution Status: Dates Taken:
20070604 20070607 20070628 20070701 20070702 20070703 20070902 20070914
Completion Status:
72%
GS-2007A-DD-8 Lee On The First Instance of A Spatial Metallicity Gradient in a Dwarf Irregular Galaxy GMOS-S 4.50
Execution Status: complete Dates Taken:
20070607 20070712 20070716 20070717 20070718 20071106
Completion Status:
100%
GS-2007A-DD-9 Volk Mid-Infrared Imaging of Planetary Nebulae TReCS 6.00
Execution Status: complete Dates Taken:
20070703 20070712 20070913 20070926 20071010 20071012 20071014
Completion Status:
100%
GS-2007A-DD-13 Bergmann Stellar Populations in Abell 4038: A GMOS-S bright time spectroscopy proposal GMOS-S 5.00
Execution Status: complete Dates Taken:
20070605 20070606 20070607 20070616 20070620 20070621 20070624 20070625 20070630 20070721 20070722 20070723
Completion Status:
100%
GS-2007A-DD-14 Carrasco Spectroscopic confirmation of galaxies in SDSS compact groups at z~0.3 GMOS-S 8.60
Execution Status: Dates Taken:
20070610 20070616 20070707 20070711 20070712 20070718 20070721 20070804 20070805 20070807 20070820
Completion Status:
62%
GS-2007A-DD-15 Artigau Spectroscopic characterisation of wide binary systems harbouring a cool dwarf GMOS-S 22.14
Execution Status: Dates Taken:
20070617 20070621 20070624 20070705 20070715 20070807 20070808
Completion Status:
36%
GS-2007A-DD-17 Mast Kick-off supermassive black hole, first microquasar outside the MW, or the largest radio galaxy at high redshift? GMOS-S 2.00
Execution Status: complete Dates Taken:
20070616 20070617 20070622 20070630 20070710 20070711 20070807
Completion Status:
100%

 