[Mayan calendar]

Queue Summary : Semester 2015A GS

The queues shown in the tables below summarise the programs that have been awarded time on GS. Jump directly to the queue for:

The queue is constructed by the International TAC from the ranked list of proposals of each National TAC using the merging sequence and is divided into three scientific ranking bands (SRBs). Joint proposals (submitted to more than one NTAC for joint support) were combined by the ITAC, are shown in the table as a single entry and are executed as such. Several proposals have multiple occurrences as they were sub-divided by the relevant NTAC; each component is executed separately.

Within each band, all proposals are assumed to have equal scientific merit and have been sorted by PI name for convenience. The choice of which observation within which program to execute next depends on the match to current observing conditions, the balance of each partner's usage and other factors such as future accessibility, whether a program has been started etc. (see a detailed discussion in Puxley 1997; Gemini Preprint #19). The aim is to exhaust band 1 (highest ranked) programs before moving onto band 2 and so on. An observation in band 1 that does not require the best conditions will nevertheless be executed in preference to a band 2 observation even if the latter is a better match. Thus the likelihood of execution decreases from band 1 through to band 3. Bands 1 through 3 aim to fill the nominal queue time available (excluding weather loss). Hence programs in band 3 overfill the queue and provide flexibility with respect to weather conditions and foreseen or unforeseen problems.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.

Note that individual SRBs will not be in detailed balance with respect to partner shares. Aggregating over two or more bands generally provides an equitable distribution of queue loading (in hours, not in the number of proposals) once any classically-scheduled programs are taken into account. Additional flexibility is available when executing observations to balance the partner usage of time. The intent is to achieve balance over 2 or 3 semesters, not a single semester.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2015A-DD-1 Neichel DD High-angular view of high-redshift LBGs GSAOI+GeMS Adaptive Optics 4.50
Execution Status: complete Dates Taken:
20150309 20150310
Completion Status:
100%
GS-2015A-DD-3 Michaud DD The Gemini South legacy images program: PR images for 2015A GSAOI+GeMS Adaptive Optics 0.50
Execution Status: complete Dates Taken:
20150311 20150312
Completion Status:
100%
GS-2015A-DD-4 Currie DD Rapid Follow-up Confirmation and Characterization of Newly Identified Young Exoplanetary Systems: The First Discoveries with GPI GPI 2.40
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-DD-5 Cieza DD Confirming a protoplanet candidate in the HD135344B transition disk GPI 2.50
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-DD-7 Trujillo DD Distant Solar System Objects GMOS / GMOS-S 1.50 [r16A]
Execution Status: complete / rollover Dates Taken:
20150616 20150618
Completion Status:
100%
GS-2015A-LP-1 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 (South) GMOS-S 18.60
Execution Status: Dates Taken:
20150220 20150222 20150224 20150225 20150226 20150411 20150722
Completion Status:
67%
GS-2015A-LP-2 Fritz LP Probing the dark halo of the Milky Way with GeMS/GSAOI GSAOI+GeMS Adaptive Optics 20.40
Execution Status: Dates Taken:
20150305 20150310 20150312 20150313 20150528 20150530 20150531 20150602
Completion Status:
66%
GS-2015A-LP-3 Masiero LP Followup of newly discoverd Near-Earth objects from the NEOWISE survey GMOS-S 8.00
Execution Status: SToO Dates Taken:
20150205 20150218 20150409 20150525 20150531 20150602
Completion Status:
26%
GS-2015A-LP-4 Werk LP Where Accretion Meets Feedback: A Galaxy Redshift Survey in HST/COS Quasar Fields (South) GMOS-S 13.75
Execution Status: Dates Taken:
20150216 20150217 20150218 20150418
Completion Status:
41%
GS-2015A-Q-1 Zepf US Long-Term X-ray and Optical Study of the Black Hole X-ray Binaries in the Elliptical Galaxies NGC 4472 GMOS-S 14.80 [r16A]
Execution Status: complete / rollover Dates Taken:
20150306 20150307 20150314 20150315 20150316 20150317 20150401 20150413 20150422 20150429 20150518 20150520
Completion Status:
100%
GS-2015A-Q-2 Verbiscer US Superior Mutual Event of (79360) Sila-Nunam GMOS-S 7.50
Execution Status: complete Dates Taken:
20150216
Completion Status:
100%
GS-2015A-Q-3 Steiner BR LLP - The Gemini Survey of Galactic Nuclei - GSGN GMOS-S 17.00
Execution Status: complete Dates Taken:
20150213 20150214 20150302 20150429 20150430 20150509 20150510 20150511 20150512
Completion Status:
100%
GS-2015A-Q-4 Scholz CA Rapid Target of Opportunity Gemini Infrared Observations of Magnetars in Outburst (South) Flamingos2 5.20
Execution Status: RToO Dates Taken:
Completion Status:
0%
GS-2015A-Q-5 Sand US Constraining Type Ia Supernova Physics with Near-Infrared Spectroscopy (South) Flamingos2 8.50
Execution Status: SToO Dates Taken:
20150323 20150325 20150403 20150423 20150424 20150425 20150428 20150501 20150508 20150518 20150608 20150721 20150730
Completion Status:
87%
GS-2015A-Q-6 Ryder AU Sealing the first supernova discovery with GeMS/GSAOI GSAOI+GeMS Adaptive Optics 2.30
Execution Status: complete Dates Taken:
20150531 20150601 20150602
Completion Status:
100%
GS-2015A-Q-7 Ryder AU Project SUNBIRD: Supernovae UNmasked By Infra-Red Detection GSAOI+GeMS Adaptive Optics 10.80
Execution Status: complete / SToO Dates Taken:
20150305 20150309 20150310 20150311 20150530 20150531 20150601
Completion Status:
100%
GS-2015A-Q-8 Rojo CL/US Investigating seasonal changes in Titan's meteorology through cloud monitoring with GPI GPI 8.00
Execution Status: RToO Dates Taken:
Completion Status:
0%
GS-2015A-Q-9 Roediger CA/US Towards a Panchromatic Understanding of Old Stellar Systems GMOS-S 30.00 [r16A]
Execution Status: rollover Dates Taken:
20150214 20150226 20150227 20150401 20150615 20150929 20151111 20151122 20151211 20160112 20160215 20160407 20160408 20160409 20160608 20160706 20160802 20160803 20160804 20160806 20160808
Completion Status:
84%
GS-2015A-Q-10 Richtler CL Is there dark matter in NGC 3962? GMOS-S 12.00
Execution Status: complete Dates Taken:
20150213 20150226 20150227 20150319 20150419 20150421 20150423 20150424 20150519 20150607 20150608 20150610 20150616 20150618 20150621
Completion Status:
100%
GS-2015A-Q-11 Niino JP The complete metallicity measurements of long GRB host galaxies at z < 0.5 (South) GMOS-S 5.00
Execution Status: complete Dates Taken:
20150214 20150226 20150227 20150423 20150424 20150425 20150428 20150514
Completion Status:
100%
GS-2015A-Q-12 Nagar CL A kinematic survey of the Narrow Line Region in nearby Active Galaxies: Continuation GMOS-S 7.40
Execution Status: Dates Taken:
20150226 20150227 20150511 20150518 20150519 20150530 20150606 20150607 20150621 20150905
Completion Status:
45%
GS-2015A-Q-13 Moskovitz US Mission Accessible Near-Earth Objects Survey (MANOS) (South) GMOS-S 6.50
Execution Status: complete / SToO Dates Taken:
20150202 20150203 20150214 20150218 20150225 20150226 20150302 20150303 20150304 20150311 20150403
Completion Status:
100%
GS-2015A-Q-14 Millar-Blanchaer CA Characterizing the inner regions of the GJ 581 debris disk GPI 2.00 [r16A]
Execution Status: rollover Dates Taken:
Completion Status:
0%
GS-2015A-Q-15 Martioli BR Using GPI to obtain direct imaging of the massive exoplanet candidate HIP 70849 b GPI 5.00 [r16A]
Execution Status: rollover Dates Taken:
20150202 20150402 20150403 20150424 20160122
Completion Status:
60%
GS-2015A-Q-16 Lu US Young Massive Clusters in the Milky Way GSAOI+GeMS Adaptive Optics 22.50
Execution Status: Dates Taken:
20150305 20150310 20150311 20150312 20150313 20150605
Completion Status:
37%
GS-2015A-Q-17 Liu US Spectroscopic Follow-Up of Variability Selected Binary Supermassive Black Hole Candidates GMOS-S 5.30 [r16A]
Execution Status: complete / rollover Dates Taken:
20150527 20150530 20150611 20150614 20150615 20150616 20150620
Completion Status:
100%
GS-2015A-Q-18 Lira CL Reverberation Mapping of high-z QSOs: the final stages Flamingos2 1.50
Execution Status: complete Dates Taken:
20150514 20150601 20150627
Completion Status:
100%
GS-2015A-Q-19 Li US The First Polarimetric Mapping of Ceres GPI 9.50 [r16A]
Execution Status: rollover Dates Taken:
20150708
Completion Status:
22%
GS-2015A-Q-20 Ireland AU/CA/CL/US The Planetary Systems of Young Massive Stars GPI 20.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-Q-21 Graham CA/US Astrometry of Beta Pic with GPI GPI 1.20 [r16A]
Execution Status: complete / rollover Dates Taken:
20150402
Completion Status:
100%
GS-2015A-Q-22 Ghez US Using MCAO to Enable Unique Test of General Relativity at the Galactic Center GSAOI+GeMS Adaptive Optics 14.40
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-Q-23 Escudero AR The globular cluster color-color relations: combining optical and NIR photometry. Flamingos2 2.70
Execution Status: Dates Taken:
20150724
Completion Status:
6%
GS-2015A-Q-24 Currie CA/US Confirming and Characterizing Two Young Planetary Companions with GPI GPI 10.00
Execution Status: Dates Taken:
20150118 20150402 20150709
Completion Status:
25%
GS-2015A-Q-25 Cuadra CL Star formation and dynamics at < 2.5 pc from Sgr A* GSAOI+GeMS Adaptive Optics 10.00
Execution Status: Dates Taken:
20150602
Completion Status:
2%
GS-2015A-Q-26 Cote CA Measuring Mass-to-Light in Nearby Dwarf Spheroidal Galaxies (South) GMOS-S 10.73 [r16A]
Execution Status: complete / rollover Dates Taken:
20150304 20150316 20150317 20150319 20150322
Completion Status:
100%
GS-2015A-Q-27 Chen US Does the HR 4796 Debris Disk Contain Icy Grains? GPI 8.00 [r16A]
Execution Status: rollover Dates Taken:
20150402 20150403
Completion Status:
73%
GS-2015A-Q-28 Caso AR Revealing the mass profile of the brightest cluster galaxy NGC 3258 GMOS-S 4.60
Execution Status: complete Dates Taken:
20150122 20150123
Completion Status:
100%
GS-2015A-Q-29 Bowler US Near-Infrared Spectroscopy of the Young Substellar Benchmark PZ Tel B GPI 3.50
Execution Status: SToO Dates Taken:
Completion Status:
0%
GS-2015A-Q-30 Bochanski US The Most Distant Stars in the Milky Way GMOS-S 50.00 [r16A]
Execution Status: complete / rollover Dates Taken:
20150214 20150215 20150218 20150219 20150224 20150225 20150226 20150302 20150331 20150409 20150412 20150413 20150418 20150419 20150422 20150423 20150424 20150425 20150428 20150514 20150519 20150606 20150608 20150618 20150718 20150721 20150904 20150905 20150907 20151129 20151214 20160116 20160202 20160608 20160609 20160730 20160802 20160803 20160808
Completion Status:
100%
GS-2015A-Q-31 Blakeslee CA Multiconjugate Fluctuations: A First Application of the Surface Brightness Fluctuations Method with GeMS GSAOI+GeMS Adaptive Optics 7.00
Execution Status: complete Dates Taken:
20150309 20150310 20150311 20150312
Completion Status:
100%
GS-2015A-Q-93 Hwang KR Pre-Imaging for GS-2015A-Q-200 GMOS-S 1.20
Execution Status: complete Dates Taken:
Completion Status:
100%
GS-2015A-Q-94 Lee KR Pre-Imaging for GS-2015A-Q-203 GMOS-S 1.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-Q-95 Shim KR Pre-imaging for GS-2015A-Q-204 GMOS-S 1.00
Execution Status: complete Dates Taken:
20150422 20150516 20150528 20150616
Completion Status:
100%
GS-2015A-Q-200 Hwang KR Measuring the Halo Mass Profile of z~0.68 Galaxy Cluster DLSCL J1055.2-0503 GMOS-S 10.00
Execution Status: Dates Taken:
20150125 20150410 20150415 20150416 20150417 20150418
Completion Status:
68%
GS-2015A-Q-201 Im KR Spectroscopic Confirmation of Faint Quasars at z ~ 6 GMOS / GMOS-S 10.00
Execution Status: complete Dates Taken:
20150226 20150415 20150417 20150418 20150721 20150722 20150723
Completion Status:
100%
GS-2015A-Q-500 Macintosh GPIES Campaign 2015A GPI 0.00
Execution Status: complete Dates Taken:
20150404 20150405 20150406 20150407 20150408 20150501 20150504 20150701 20150702 20150703 20150704 20150705 20150729 20150730 20150731 20150801
Completion Status:
100%
GS-2015A-Q-501 Macintosh GPIES Campaign 2015A Followup targets - private headers GPI 0.00
Execution Status: complete Dates Taken:
20150404 20150406 20150408 20150505 20150701 20150703 20150705 20150730
Completion Status:
100%
GS-2015A-Q-503 Macintosh GT GPI Guaranteed Time 2015A 20.00
Execution Status: Dates Taken:
Completion Status:
0%
GS Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2015A-DD-2 Neichel DD High-angular view of high-redshift LBGs GSAOI+GeMS Adaptive Optics 4.50
Execution Status: Dates Taken:
20150313
Completion Status:
10%
GS-2015A-DD-6 Rapson DD Hot on the Trail of the Planet Sculpting the TW Hya Disk GPI 1.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-DD-8 Melis DD Confirming a Debris Disk Resolved for the First Time by GPI Early Science Polarization Imaging GPI 3.00
Execution Status: Dates Taken:
20150827 20150902
Completion Status:
52%
GS-2015A-LP-5 Buckley-Geer LP Spectroscopic Confirmation and AO imaging Follow-Up of Dark Energy Survey Strong Lensing Systems and Spectra for Photometric Redshift Calibration GMOS-S 12.00
Execution Status: Dates Taken:
20150226 20150227 20150701 20150706 20150717 20150719 20150725 20150821 20151204
Completion Status:
26%
GS-2015A-Q-32 Tuthill AU/US The circumbinary disk and immediate environs of post-AGB stars at high resolution and deep contrast GPI 10.00
Execution Status: Dates Taken:
20150125 20150515
Completion Status:
-0%
GS-2015A-Q-33 Tucker US Catching Supernovae in the Act with KEGS (Kepler Extra-Galactic Survey) (South) GMOS-S 11.20
Execution Status: SToO Dates Taken:
20150618 20150619 20150620 20150622 20150623
Completion Status:
34%
GS-2015A-Q-34 Tappert CL Recovery of old novae GMOS-S 10.40
Execution Status: complete Dates Taken:
20150226 20150227 20150319 20150321 20150331 20150402 20150418 20150422 20150425 20150426 20150427 20150428 20150429 20150518 20150616 20150724
Completion Status:
100%
GS-2015A-Q-35 Steiner BR LLP - The Gemini Survey of Galactic Nuclei - GSGN GMOS-S 4.00
Execution Status: complete Dates Taken:
20150213 20150511 20150512 20150515 20150516 20150718 20150721 20150723 20150821 20160114 20160117 20160118
Completion Status:
100%
GS-2015A-Q-36 Smith Castelli AR Multiwavelength study of star-forming dwarf galaxies in dense environments (South) Flamingos2 / GMOS-S 3.80
Execution Status: complete Dates Taken:
20150217 20150218 20150412 20150424 20150519 20150609 20150621
Completion Status:
100%
GS-2015A-Q-37 Shannon AU The optical counterpart to a Fast Radio Burst GMOS-S 2.80
Execution Status: complete Dates Taken:
20150429
Completion Status:
100%
GS-2015A-Q-38 Schworer AU Mapping the dust in planet-forming disks using polarimetric masking interferometry GPI 10.00
Execution Status: Dates Taken:
20150516
Completion Status:
-0%
GS-2015A-Q-39 Scholz CA Target of Opportunity Gemini Infrared Observations of Magnetars in Outburst (South) Flamingos2 13.90
Execution Status: SToO Dates Taken:
Completion Status:
0%
GS-2015A-Q-40 Saha US Establishing a Network of DA White Dwarf SED Standards (South) GMOS-S 4.25
Execution Status: complete Dates Taken:
20150518
Completion Status:
100%
GS-2015A-Q-41 Rest US Spectrophotometric Time Series of eta Carinae's Great Eruption GMOS-S 14.30
Execution Status: SToO Dates Taken:
20150607
Completion Status:
17%
GS-2015A-Q-42 Rapson US Polarimetric Imaging of the Protoplanetary Disks TW Hya and V4046 Sgr GPI 6.00
Execution Status: Dates Taken:
20150423
Completion Status:
45%
GS-2015A-Q-43 Rajagopal US Imaging and Astrometry of the Active Asteroid P/2010 A2 GMOS-S 4.60
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-Q-44 Piatti AR Probing the existence of tidal-dynamical effects for star clusters located in the outskirts of the LMC GMOS-S 3.20
Execution Status: Dates Taken:
20150215 20150516
Completion Status:
30%
GS-2015A-Q-45 Perlmutter AU/US See Change: Testing for time-varying dark energy with z > 1 supernovae and their massive cluster hosts (South) GMOS-S 29.50
Execution Status: SToO Dates Taken:
20150215 20150217 20150218 20150219 20150321 20150322 20150323 20150331 20150421 20150619 20150623 20150701
Completion Status:
31%
GS-2015A-Q-46 Patience CA/US Monitoring the Atmospheres of the HR 8799 Planets GPI 8.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-Q-47 Patience CA Characterizing the atmosphere of the imaged planet HD 95086 b with GPI GPI 3.00
Execution Status: complete Dates Taken:
20150424
Completion Status:
100%
GS-2015A-Q-48 Moskovitz US Mission Accessible Near-Earth Objects Survey (MANOS) (South) GMOS-S 6.50
Execution Status: complete / SToO Dates Taken:
20150312 20150412 20150414 20150520 20150521 20150523 20150524 20150525
Completion Status:
100%
GS-2015A-Q-49 Monnier US Imaging Planet Formation in situ with Gemini Planet Imager GPI 10.50
Execution Status: Dates Taken:
20150709
Completion Status:
12%
GS-2015A-Q-50 Marinello BR Unraveling the excitation mechanisms of AGN ultra-strong FeII emitters (South) Flamingos2 8.30
Execution Status: complete Dates Taken:
20150304 20150620 20150621 20150627 20150629 20150707 20150724 20150725
Completion Status:
100%
GS-2015A-Q-51 Lomax US Illuminating New Circumstellar Paramter Space Around Eta Car with GPI GPI 4.80
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-Q-52 Leggett CL Characterizing new late-T and Y dwarfs at the faint limits of WISE (South) Flamingos2 20.00
Execution Status: complete Dates Taken:
20150114 20150116 20150119 20150120 20150123 20150124 20150202 20150203 20150409 20150411 20150416 20150718 20150720 20150722 20150724 20150802
Completion Status:
100%
GS-2015A-Q-53 Krafton US Late-Time Dust Formation in Core-Collapse Supernovae (South) GMOS-S 5.50
Execution Status: complete Dates Taken:
20150214 20150226 20150419 20150424 20150524 20150609
Completion Status:
100%
GS-2015A-Q-54 Knight US Multi-scale investigation of the coma of comet 67P/Churyumov-Gerasimenko: Combined Gemini and Rosetta study of activity Flamingos2 7.00
Execution Status: Dates Taken:
20150527 20150616 20150620 20150624 20150625 20150626 20150630
Completion Status:
30%
GS-2015A-Q-55 Jonker US The unique opportunity to determine the mass of an accreting neutron star: the eclipsing accretion powered X-ray pulsar SWIFTJ1749.4-2807 Flamingos2 9.00
Execution Status: Dates Taken:
20150513 20150601 20150604
Completion Status:
23%
GS-2015A-Q-56 Howell US The LCOGT Supernova Key Project (South) GMOS-S 9.00
Execution Status: SToO Dates Taken:
20150319 20150320 20150321 20150322 20150331 20150401 20150514 20150531 20150609 20150718 20150719 20150721 20150723 20150725
Completion Status:
91%
GS-2015A-Q-57 Hinkle US The Nascent Planetary Nebula around Sakurai's Object (South) GMOS-S 1.00
Execution Status: complete Dates Taken:
20150315 20150317 20150513 20150613
Completion Status:
100%
GS-2015A-Q-58 Haines CA/US LoCuSS: Pre-processing within X-ray-selected groups infalling into z~0.2 clusters (South) GMOS-S 4.20
Execution Status: complete Dates Taken:
20150319 20150321 20150322 20150401 20150424 20150427 20150428 20150514 20150521 20150524 20150601 20150609
Completion Status:
100%
GS-2015A-Q-59 Garcia-Vergara CL The First QSO-LAE Cross Correlation Function Measurement at z ~ 4. GMOS-S 7.50
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-Q-60 Gagné CA Spectroscopic confirmation of brown dwarfs and isolated giant planet analogs in nearby, young moving groups Flamingos2 20.00
Execution Status: complete Dates Taken:
20150123 20150131 20150205 20150211 20150213 20150226 20150406 20150407 20150412 20150424 20150426 20150427 20150428 20150430 20150505 20150509
Completion Status:
100%
GS-2015A-Q-61 Fraga AR/BR A pilot study to Investigate the disks around λ Bootis stars GPI 6.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-Q-62 Figer US Constraining the Properties of GLIMPSE-C01 - potentially the most massive young cluster in the Galaxy Flamingos2 3.40
Execution Status: complete Dates Taken:
20150510 20150511 20150512
Completion Status:
100%
GS-2015A-Q-63 Feldmeier US The Milky Way nuclear star cluster as a benchmark for the structure and build-up of galactic nuclei Flamingos2 37.60
Execution Status: complete Dates Taken:
20150613 20150619 20150622 20150624 20150625 20150626 20150627 20150629
Completion Status:
100%
GS-2015A-Q-64 Esplin US Searching for the Bottom of the Initial Mass Function Flamingos2 7.20
Execution Status: complete Dates Taken:
20150123 20150202 20150203 20150204 20150205 20150213 20150303
Completion Status:
100%
GS-2015A-Q-65 de Oliveira BR Chromospheric Activity in Old Open Cluster: NGC 6253 GMOS-S 3.20
Execution Status: Dates Taken:
20150421 20150524 20150610 20150621
Completion Status:
67%
GS-2015A-Q-66 Cúneo AR Chemical abundances of polluted visible component atmosphere in black hole binary systems GMOS-S 2.10
Execution Status: complete Dates Taken:
20150304 20150321 20150524 20150608
Completion Status:
100%
GS-2015A-Q-67 Crnojevic US Environment and the evolution at low-mass galactic scales: clues from the Cen A group Flamingos2 18.70
Execution Status: Dates Taken:
Completion Status:
0%
GS-2015A-Q-68 Cheetham AU Hidden under the coronagraph spot: transition disk exoplanets at 5AU scales GPI 2.00
Execution Status: Dates Taken:
20150403
Completion Status:
28%
GS-2015A-Q-69 Burgasser US Mass Measurements Across the Hydrogen Burning Limit: Astrometric Orbits for Spectral Binaries GMOS-S 22.70
Execution Status: Dates Taken:
20150216 20150304 20150314 20150315 20150511 20150513 20150601 20150604 20150630 20150701
Completion Status:
64%
GS-2015A-Q-70 Bassett US Local Counterparts to High-Redshift Turbulent Galaxies: What are the Stellar Kinematics? GMOS-S 12.00
Execution Status: Dates Taken:
20150131 20150525 20150602 20150611 20150612 20150615 20150616 20150618
Completion Status:
91%
GS-2015A-Q-71 Baron CA Wide Imaging Search for Benchmark Planets Flamingos2 / GMOS-S 20.00
Execution Status: complete Dates Taken:
20150211 20150223 20150224 20150302 20150303 20150304 20150309 20150314 20150315 20150316 20150322 20150323 20150331 20150401 20150406 20150410 20150412 20150417 20150418 20150419 20150422 20150423 20150424 20150425 20150429 20150430 20150513 20150604 20150617 20150620 20150630
Completion Status:
100%
GS-2015A-Q-202 Gobat KR Grow fast, die early: dynamical mass and stellar population of the most distant ETG Flamingos2 10.00
Execution Status: complete Dates Taken:
20150415 20150417 20150418 20150430
Completion Status:
100%
GS Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GS-2015A-Q-72 Winkler US Fast SNR Shocks and Cosmic Rays: Unique Opportunities in SN1006 GMOS-S 19.10
Execution Status: Dates Taken:
20150215 20150317 20150320 20150323 20150414 20150512 20150708 20150709 20150718 20150719 20150912 20160114
Completion Status:
80%
GS-2015A-Q-73 Vazzano AR Search for jet shocked excited regions towards YSOs in Gum 31 Flamingos2 6.20
Execution Status: complete Dates Taken:
20150409 20150412 20150519 20150617
Completion Status:
100%
GS-2015A-Q-74 Tinney AU Completing the Spectrscopic Identification of WISE T and Y dwarfs Flamingos2 10.40
Execution Status: complete Dates Taken:
20150131 20150530 20150602 20150616 20150617 20150618
Completion Status:
100%
GS-2015A-Q-75 Tappert CL Recovery of old novae GMOS-S 10.00
Execution Status: complete Dates Taken:
20150226 20150227 20150413 20150414 20150418 20150419 20150518 20150519 20150520 20150524 20150530 20150607 20150609 20150719 20150721 20150723 20150804
Completion Status:
100%
GS-2015A-Q-76 Sung US Mass Accretion Rate of Very Low Luminosity Objects Flamingos2 0.90
Execution Status: complete Dates Taken:
20150403 20150427 20150721
Completion Status:
100%
GS-2015A-Q-77 Schlaufman US An All-Sky Search for the Brightest Metal-Poor Stars (South) GMOS-S 42.80
Execution Status: complete Dates Taken:
20150201 20150227 20150301 20150304 20150315 20150318 20150319 20150320 20150321 20150323 20150331 20150401 20150402 20150403 20150413 20150414 20150418 20150421 20150422 20150423 20150426 20150427 20150428 20150513 20150515 20150516 20150518 20150520 20150523 20150524 20150525 20150527 20150528 20150529 20150530 20150531 20150602 20150613
Completion Status:
100%
GS-2015A-Q-78 Sargent US Confirming Inner Galactic Bulge OH/IR Stars' Identities with Flamingos-2 Flamingos2 5.90
Execution Status: complete Dates Taken:
20150522 20150602 20150607 20150608 20150617 20150618 20150621 20150629 20150630 20150707 20150723 20150724
Completion Status:
100%
GS-2015A-Q-79 Ouellette CA/CL/US The Dynamical Properties and Velocity Function of Virgo Cluster Galaxies (South) GMOS-S 27.80
Execution Status: Dates Taken:
20150319 20150321 20150413 20150513 20150516 20150612 20150615 20150616 20150617 20150618
Completion Status:
21%
GS-2015A-Q-80 Lopes BR The Dynamics of Interacting Galaxy Clusters (South) GMOS-S 3.60
Execution Status: complete Dates Taken:
20150317 20150318 20150515
Completion Status:
100%
GS-2015A-Q-81 Kilic US The First Pulsar + Pulsating White Dwarf System (South) GMOS-S 4.00
Execution Status: Dates Taken:
20150615 20150617 20150723
Completion Status:
70%
GS-2015A-Q-82 Jorgensen US RDCSJ1252-2927 - stellar populations in a massive z=1.24 galaxy cluster GMOS-S 30.50
Execution Status: Dates Taken:
20150121 20150226 20150227 20150306 20150313 20150314 20150316 20150317 20150318 20150319 20150321 20150322 20150401 20150402 20150428 20150430 20150510 20150531 20150603 20150604 20150630 20150725 20150726 20150727 20150729 20150825
Completion Status:
88%
GS-2015A-Q-83 Johnston AU The nature of the companion star in U Sco GMOS-S 2.30
Execution Status: Dates Taken:
20150226 20150227 20150401 20150519 20150607 20150623
Completion Status:
65%
GS-2015A-Q-84 Jeffery BR Deep Observations of the Open Cluster NGC 6253 GMOS-S 4.00
Execution Status: complete Dates Taken:
20150318 20150319
Completion Status:
100%
GS-2015A-Q-85 Gagné CA Spectroscopic confirmation of brown dwarfs and isolated giant planet analogs in nearby, young moving groups Flamingos2 15.70
Execution Status: complete Dates Taken:
20150414 20150426 20150428 20150508 20150510 20150513 20150519 20150520 20150521 20150522 20150525 20150526 20150603 20150605 20150606 20150618
Completion Status:
100%
GS-2015A-Q-86 Drahus US Rotation of Main Belt Comets (South) GMOS-S 8.00
Execution Status: complete Dates Taken:
20150521 20150522 20160305
Completion Status:
100%
GS-2015A-Q-87 de Souza Angelo BR Investigation of Galactic open cluster remnants: the cases of Ruprecht 31 and ESO570-SC12 GMOS-S 5.00
Execution Status: Dates Taken:
20150205 20150610 20150611 20150612 20150613 20150615 20150616 20150617 20150619 20150621 20150624 20150629 20150630 20160206
Completion Status:
87%
GS-2015A-Q-88 Chené CA/US WR 63: a new rare multiple massive star system GMOS-S 12.30
Execution Status: Dates Taken:
20150206 20150213 20150226 20150227 20150331 20150508 20150519 20150619 20150626 20150718 20150726
Completion Status:
38%
GS-2015A-Q-89 Britt CA/US Dynamical Mass Measurements of Eclipsing Candidate Black Hole Binaries Discovered in Quiescence GMOS-S 21.00
Execution Status: complete Dates Taken:
20150214 20150226 20150227 20150317 20150319 20150331 20150510 20150513 20150518 20150524 20150528 20150530 20150607 20150608 20150609 20150615
Completion Status:
100%
GS-2015A-Q-90 Blair US Characterizing the Young Supernova Remnant Population in M83 GMOS-S 13.60
Execution Status: complete Dates Taken:
20150421 20150424 20150426 20150510 20150515 20150519 20150525 20150612 20150619 20150620
Completion Status:
100%
GS-2015A-Q-91 Alexander US Optical Spectroscopy of Two Gamma-ray binaries GMOS-S 15.70
Execution Status: Dates Taken:
20150227 20150316 20150317 20150320 20150331 20150401 20150413 20150414 20150421 20150422 20150427 20150428 20150522
Completion Status:
63%
GS-2015A-Q-203 Lee KR Confirmation of Galaxy Clusters embedded in Large Scale Structures at z~3 GMOS-S 5.00
Execution Status: complete Dates Taken:
20150721 20150723 20150724
Completion Status:
100%
GS-2015A-Q-204 Shim KR Search for MgII absorbing galaxies in cluster environment GMOS-S 5.00
Execution Status: complete Dates Taken:
20150721 20150723 20150724 20150805
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 12:48:00 GMT