[Mayan calendar]

Queue Summary : Semester 2014B GS

The queues shown in the tables below summarise the programs that have been awarded time on GS. Jump directly to the queue for:

The queue is constructed by the International TAC from the ranked list of proposals of each National TAC using the merging sequence and is divided into three scientific ranking bands (SRBs). Joint proposals (submitted to more than one NTAC for joint support) were combined by the ITAC, are shown in the table as a single entry and are executed as such. Several proposals have multiple occurrences as they were sub-divided by the relevant NTAC; each component is executed separately.

Within each band, all proposals are assumed to have equal scientific merit and have been sorted by PI name for convenience. The choice of which observation within which program to execute next depends on the match to current observing conditions, the balance of each partner's usage and other factors such as future accessibility, whether a program has been started etc. (see a detailed discussion in Puxley 1997; Gemini Preprint #19). The aim is to exhaust band 1 (highest ranked) programs before moving onto band 2 and so on. An observation in band 1 that does not require the best conditions will nevertheless be executed in preference to a band 2 observation even if the latter is a better match. Thus the likelihood of execution decreases from band 1 through to band 3. Bands 1 through 3 aim to fill the nominal queue time available (excluding weather loss). Hence programs in band 3 overfill the queue and provide flexibility with respect to weather conditions and foreseen or unforeseen problems.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.

Note that individual SRBs will not be in detailed balance with respect to partner shares. Aggregating over two or more bands generally provides an equitable distribution of queue loading (in hours, not in the number of proposals) once any classically-scheduled programs are taken into account. Additional flexibility is available when executing observations to balance the partner usage of time. The intent is to achieve balance over 2 or 3 semesters, not a single semester.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2014B-DD-1 Carrasco DD Gemini Frontier Fields campaign Flamingos2 / GSAOI+GeMS Adaptive Optics 10.20
Execution Status: Dates Taken:
20140907 20140922
Completion Status:
34%
GS-2014B-DD-2 Whiting DD Confirming ASKAP's first scientific discovery - a detection of HI absorption at z=0.44 GMOS-S 2.60
Execution Status: complete Dates Taken:
20140919 20140921 20140922
Completion Status:
100%
GS-2014B-DD-3 Jerjen DD The true nature of Indus1, a new stellar overdensity in the Milky Way halo GMOS-S 2.30
Execution Status: complete Dates Taken:
20140920 20140921 20140922 20140930 20141029
Completion Status:
100%
GS-2014B-DD-4 Treister DD Optical follow-up of a Fast Unexplained X-ray Transient in the CDF-S GMOS-S 1.50
Execution Status: complete Dates Taken:
20141028
Completion Status:
100%
GS-2014B-DD-5 Macintosh DD Deep Imaging of a Candidate Companion around a Nearby Star GPI 1.20
Execution Status: complete Dates Taken:
20141122
Completion Status:
100%
GS-2014B-DD-6 Madrid DD Does the BCG of Abell 85 host the most massive black hole in the known Universe? GMOS-S 0.20
Execution Status: complete Dates Taken:
20141115
Completion Status:
100%
GS-2014B-DD-7 Foley DD Completing the Picture for a Well-Observed Tidal Disruption Event GMOS-S 3.50
Execution Status: Dates Taken:
20150215 20150224 20150225 20150226 20150724
Completion Status:
6%
GS-2014B-DD-8 Drlica-Wagner DD Spectroscopic Confirmation of Milky Way Satellite Galaxy Candidate DES J0335.7-5403 GMOS-S 10.00
Execution Status: Dates Taken:
20150214 20150215 20150218 20150219 20150307 20150512 20150725
Completion Status:
62%
GS-2014B-LP-1 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 GMOS-S 39.80
Execution Status: Dates Taken:
20140906 20140914 20140928 20140930 20141001 20141013 20141014 20141106 20141112 20141114 20141115 20141116 20141117 20141118 20141119 20141231 20150101 20150222 20150223
Completion Status:
93%
GS-2014B-LP-2 Fritz LP Probing the dark halo of the Milky Way with GeMS/GSAOI GMOS-S / GSAOI+GeMS Adaptive Optics 27.40
Execution Status: complete Dates Taken:
20140907 20140908 20140921 20141029 20141119 20141201 20141203 20141209 20141210 20141211 20150107 20150108 20150109 20150110
Completion Status:
100%
GS-2014B-LP-3 Masiero LP Followup of newly discoverd Near-Earth objects from the NEOWISE survey GMOS-S 8.00
Execution Status: SToO Dates Taken:
20141003 20141006 20141011 20141019 20141028 20141113
Completion Status:
26%
GS-2014B-LP-4 Werk LP Where Accretion Meets Feedback: A Galaxy Redshift Survey in HST/COS Quasar Fields (South) GMOS-S 11.50
Execution Status: complete Dates Taken:
20140928 20141013 20141024 20141025 20141026 20141027 20141028 20141201 20141225 20150124 20150202 20150213 20150214 20150217 20150619 20150623 20150624 20150718 20150821
Completion Status:
100%
GS-2014B-Q-1 Ammons US A Test of GEMS Astrometric Precision for Exoplanet Detection and Mass Measurement GSAOI+GeMS Adaptive Optics 1.50 [r15B]
Execution Status: complete / rollover Dates Taken:
20141203 20141209 20150107 20150305
Completion Status:
100%
GS-2014B-Q-2 Baron CA Wide Imaging Search for Benchmark Planets Flamingos2 / GMOS-S 34.10
Execution Status: complete Dates Taken:
20140717 20140720 20140725 20140726 20140727 20140728 20140729 20140801 20140802 20140803 20140804 20140805 20140826 20140827 20140903 20140904 20140907 20140908 20140909 20140919 20140920 20140921 20140922 20140924 20141007 20141010 20141018
Completion Status:
100%
GS-2014B-Q-3 Bian AU Probing Circumgalactic Median and Gas Kinematics through an Einstein Ring GMOS-S 12.00 [r15B]
Execution Status: rollover Dates Taken:
20141011 20141028 20141029 20150913
Completion Status:
35%
GS-2014B-Q-4 Cenko CA/US Tidal Disruption Flares as Probes of Super-Massive Black Holes and Accretion Physics (South) GMOS-S 3.00
Execution Status: complete / SToO Dates Taken:
20150112 20150115 20150226 20150614
Completion Status:
100%
GS-2014B-Q-5 Cieza CL GPI observations of Young, Nearby, and Dusty A-type Stars GPI 8.00
Execution Status: Dates Taken:
20141122 20141124 20141220 20150116 20150117 20150119
Completion Status:
95%
GS-2014B-Q-6 Cucchiara AU/GS Exploring the first stars with rapid GRB follow-up observations (South) Flamingos2 / GMOS-S 3.60
Execution Status: complete / RToO Dates Taken:
20140930 20141001 20150115
Completion Status:
100%
GS-2014B-Q-7 Currie CA/US A GPI Investigation of Clouds and Chemistry in Planets Orbiting HR 8799 GPI 5.50 [r15B]
Execution Status: rollover Dates Taken:
Completion Status:
0%
GS-2014B-Q-8 Demaio US Baryon Fractions in Galaxy Groups GMOS-S 5.90 [r15B]
Execution Status: complete / rollover Dates Taken:
20140826 20140918 20140924 20140930 20141018 20150110 20150111 20150113 20150114 20150115
Completion Status:
100%
GS-2014B-Q-9 Desert US Comparative Exoplanetology of Hot-Jupiter Prototypes (South) GMOS-S 7.44 [r15B]
Execution Status: complete / rollover Dates Taken:
20140829 20140830 20140913 20150101 20150102
Completion Status:
100%
GS-2014B-Q-10 Hardy CL The first detection of a second-generation substellar companion GPI 2.00
Execution Status: Dates Taken:
20141122
Completion Status:
2%
GS-2014B-Q-11 Ireland AU Exoplanets Scupting the UX Tau Transitional Disk? GPI 3.00 [r15B]
Execution Status: rollover Dates Taken:
20150117 20150118
Completion Status:
7%
GS-2014B-Q-12 Jiang US Spectroscopic Identification of Three Lyman_alpha Emitters at z ~ 7 GMOS-S 19.80 [r15B]
Execution Status: rollover Dates Taken:
20140913 20141106 20141114 20141219 20141220 20151231 20160102 20160103 20160113 20160116
Completion Status:
23%
GS-2014B-Q-13 Kannappan US REsolved Spectroscopy Of a Local VolumE:\\ The RESOLVE Survey in Stripe 82 GMOS-S 22.00 [r15B]
Execution Status: rollover Dates Taken:
20140822 20140919 20140921 20141102 20141113 20141114 20141121 20141122 20150422 20150424 20151108 20151129 20151224 20151229 20151231 20160119 20160122 20160129
Completion Status:
54%
GS-2014B-Q-14 Kasliwal AU/CA/US Rapid Spectroscopy of Elusive Transients and Young Supernovae (South) GMOS-S 3.03
Execution Status: complete / RToO Dates Taken:
20140917 20141007 20141127
Completion Status:
100%
GS-2014B-Q-15 Knight US Multi-scale investigation of the coma of comet 67P/Churyumov-Gerasimenko: Combined Gemini and Rosetta study of early activity Flamingos2 8.00
Execution Status: Dates Taken:
20140920 20141029 20141101 20141114 20141118
Completion Status:
47%
GS-2014B-Q-16 Kraus US Imaging disk asymmetries and planet formation in a pre-transitional disk GPI 8.00 [r15B]
Execution Status: rollover Dates Taken:
20150118 20151224 20160119 20160121
Completion Status:
21%
GS-2014B-Q-17 Leggett GS/US Exploring the 300K Brown Dwarfs Flamingos2 17.00 [r15B]
Execution Status: complete / rollover Dates Taken:
20140909 20140918 20140925 20140927 20141008 20141013 20141104 20141105 20141107 20141113 20141204 20141212 20150103
Completion Status:
100%
GS-2014B-Q-18 Mora CL Zooming into the recent star formation event in the infalling dwarf Irregular galaxy NGC 1427A GMOS-S 10.00
Execution Status: complete Dates Taken:
20141103 20141118 20141119 20141121 20141222 20141225 20141228 20141230 20150120 20150121 20150613
Completion Status:
100%
GS-2014B-Q-19 Moskovitz US Mission Accessible Near-Earth Objects Survey (MANOS) (South) GMOS-S 6.50
Execution Status: complete / SToO Dates Taken:
20140906 20140907 20140908 20140909 20140921 20141007 20141008 20141126
Completion Status:
100%
GS-2014B-Q-20 Nagar CL A kinematic Survey of the Narrow Line Region in nearby Active Galaxies GMOS-S 7.50
Execution Status: complete Dates Taken:
20141011 20141029 20141116 20141121 20141126 20141201 20141223 20141226 20141228 20141229 20150630 20150727
Completion Status:
100%
GS-2014B-Q-21 Pereira CL LoCuSS: Pre-processing within X-ray-selected groups infalling into z~0.2 clusters (South) GMOS-S 6.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2014B-Q-22 Perez CL Mapping the protoplanetary disk in EP Cha: planet formation and dust evolution at a critical age GPI 1.50
Execution Status: complete Dates Taken:
20150120 20150125 20150403
Completion Status:
100%
GS-2014B-Q-23 Pforr US A GMOS spectroscopy survey of Herschel sources in the CANDELS UDS field GMOS-S 35.20 [r15B]
Execution Status: rollover Dates Taken:
20141030 20141031 20141101 20141127 20141128 20141223 20141225 20150110 20150111 20150119 20150120 20150123 20150125 20150214 20150706 20150822 20150908 20150911 20151201 20151205 20151208 20151209 20151212 20151214 20151215 20151216 20151217 20151229 20160101 20160113 20160115 20160119 20160202 20160203
Completion Status:
48%
GS-2014B-Q-24 Rest US Spectrophotometric Time Series of $\eta$~Carinae's Great Eruption GMOS-S 14.30
Execution Status: SToO Dates Taken:
20141026 20141031 20141113 20141114 20141124 20141224 20150101 20150115 20150117 20150125
Completion Status:
77%
GS-2014B-Q-25 Richtler CL Isolated ellipticals - key objects for the dark matter problem? GMOS-S 10.00
Execution Status: Dates Taken:
20140826 20140921 20141028 20141121 20141122 20141126 20141127 20141129
Completion Status:
35%
GS-2014B-Q-26 Rodney US The Next Frontier: High-Redshift Supernovae in the HST Frontier Fields (South) GMOS-S 5.00
Execution Status: SToO Dates Taken:
Completion Status:
0%
GS-2014B-Q-27 Sand US Constraining Type Ia Supernova Physics with Near-Infrared Spectroscopy (South) Flamingos2 / GMOS-S 12.80
Execution Status: SToO Dates Taken:
20140920 20140930 20141006 20141229 20150102 20150103 20150120
Completion Status:
71%
GS-2014B-Q-28 Sesto AR The evolution of the massive eary-type galaxies in Eridanus supergroup through their old stellar systems. GMOS-S 7.00
Execution Status: complete Dates Taken:
20140924 20141114 20141118 20141122 20141126
Completion Status:
100%
GS-2014B-Q-29 Shih GS Outflows and Stellar Populations of Gigahertz Peak Radio Sources (South) GMOS-S 6.00 [r15B]
Execution Status: complete / rollover Dates Taken:
20140821 20140918 20140922 20140927 20141222 20141223 20141231
Completion Status:
100%
GS-2014B-Q-30 Steiner BR LLP - The Gemini Survey of Galactic Nuclei - GSGN GMOS-S 17.00
Execution Status: Dates Taken:
20141124 20141127 20141128 20141130 20141201 20141202 20141219 20141220 20141223 20150125 20150624 20150626 20150726
Completion Status:
89%
GS-2014B-Q-31 Stubbs US Spectroscopy of Galaxies in Massive Clusters: \\ Galaxy Properties and Dynamical \\ Cluster Mass Calibration GMOS-S 20.00 [r15B]
Execution Status: rollover Dates Taken:
20141024 20141029 20141113 20141114 20141118 20141121 20141222 20141223 20141229 20141230 20150110 20150117 20150120 20150125 20150518 20150601 20150602 20150619 20150620 20150622 20150624 20150626 20150630 20150706 20150718 20150905 20150913 20151002 20151212 20151214 20151230 20160102 20160115
Completion Status:
87%
GS-2014B-Q-32 Tinney AU/US MCAO Astrometry and Binarity of WISE Y dwarfs GSAOI+GeMS Adaptive Optics 12.90 [r15B]
Execution Status: rollover Dates Taken:
Completion Status:
0%
GS-2014B-Q-33 Trujillo GS Distant Solar System Objects GMOS-S 1.00
Execution Status: complete / SToO Dates Taken:
20150118 20150121
Completion Status:
100%
GS-2014B-Q-34 Willott CA/US Cosmic reionization probed by lensed Lyman break galaxies GMOS-S 13.00 [r15B]
Execution Status: rollover Dates Taken:
20140821 20140822 20140917 20140923 20150908 20151212 20151214 20151231
Completion Status:
18%
GS-2014B-Q-500 Macintosh GPIES Campaign 2014B GPI 0.00
Execution Status: complete Dates Taken:
20141109 20141110 20141111 20141112 20141113 20141214 20141215 20141216 20141217 20141218 20150129 20150130 20150131 20150201
Completion Status:
100%
GS-2014B-Q-501 Macintosh GPIES Campaign 2014B Followup targets - private headers GPI 0.00
Execution Status: complete Dates Taken:
20141214 20150129 20150130 20150131
Completion Status:
100%
GS-2014B-Q-503 Macintosh GT GPI Guaranteed Time 2014B GPI 10.00
Execution Status: Dates Taken:
20150129 20150130 20150201
Completion Status:
29%
GS Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2014B-LP-5 Buckley-Geer LP Spectroscopic Confirmation and AO imaging Follow-Up of Dark Energy Survey Strong Lensing Systems and Spectra for Photometric Redshift Calibration GMOS-S 80.00
Execution Status: Dates Taken:
20141018 20141020 20141021 20141022 20141023 20141024 20141025 20141029 20141114 20141118 20141121 20141219 20141220 20141222 20141223 20141225 20141226 20141231 20150101 20150220 20150224
Completion Status:
68%
GS-2014B-Q-35 Bauer CL Resolving the peak of the Cosmic X-ray Background: Optical Follow-up for the NuSTAR Serendipitous Survey GMOS-S 5.00
Execution Status: complete Dates Taken:
20140822 20140908 20140909 20140918 20140919 20140922 20140926 20140928 20140929 20140930 20141001 20141002 20141003 20141006 20141107
Completion Status:
100%
GS-2014B-Q-36 Benson US Slaying Systematics: Maximizing Cosmological Power from HST-Measured Weak Lensing Masses of High-Redshift Clusters GMOS-S 25.00
Execution Status: complete Dates Taken:
20141202 20141223 20141225 20141228 20141229 20141230 20141231 20150101 20150111 20150112 20150113 20150115
Completion Status:
100%
GS-2014B-Q-37 Biller US Exometeorology: Searching for Weather on Beta Pictoris b GPI 17.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2014B-Q-38 Childress AU Nebular Spectra of Nearby Supernovae (South) GMOS-S 6.40
Execution Status: complete Dates Taken:
20140906 20140918 20140919 20140922 20140925 20140926 20140929 20141001 20141002
Completion Status:
100%
GS-2014B-Q-39 Christiaens CL Companions and spiral arms in the disk of Herbig AeBe disks with large gaps GPI 4.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2014B-Q-40 Cortesi BR Formation of isolated S0 galaxies GMOS-S 7.50
Execution Status: Dates Taken:
20141128 20141129 20150105 20150112 20150124 20150125
Completion Status:
59%
GS-2014B-Q-41 Cucchiara GS/US Exploring Exotic Stellar Deaths with Standard TOO GRB Follow-Up Observations (South) Flamingos2 / GMOS-S 4.00
Execution Status: SToO Dates Taken:
20141102 20150107 20150112
Completion Status:
39%
GS-2014B-Q-42 Cúneo AR Spectroscopic metallicities of polluted visible component atmosphere in black hole binary systems GMOS-S 1.50
Execution Status: complete Dates Taken:
20140919 20140921 20140922 20150121 20150802 20150822
Completion Status:
100%
GS-2014B-Q-43 de Souza Angelo BR Multi-object spectroscopy of open cluster remnants: the cases of ESO425-SC15 and Ruprecht 3 GMOS-S 3.00
Execution Status: complete Dates Taken:
20150103 20150128 20150206 20150227 20150302 20150303 20150304
Completion Status:
100%
GS-2014B-Q-44 Demarco CL Spectroscopic confirmation of an evolved galaxy cluster candidate at z=2.3 GMOS-S 13.50
Execution Status: Dates Taken:
Completion Status:
0%
GS-2014B-Q-45 Desert US Comparative Exoplanetology of Hot-Jupiter Prototypes (South) GMOS-S 7.44
Execution Status: complete Dates Taken:
20140916 20140924 20140925 20140927 20141001 20141002 20141018 20141231
Completion Status:
100%
GS-2014B-Q-46 Eigenthaler CL Spatially resolved stellar population parameters of three fossil group first-ranked galaxies GMOS-S 7.50
Execution Status: complete Dates Taken:
20140822 20140911 20140918 20140925 20140928 20141121 20141226
Completion Status:
100%
GS-2014B-Q-47 Gagné CA Spectroscopic confirmation of very low-mass stars, brown dwarfs and planetary-mass candidates in nearby, young moving groups (South) Flamingos2 / GMOS-S 7.90
Execution Status: complete Dates Taken:
20140827 20140918 20140922 20140928 20141009 20141210 20141212 20141213 20141215 20150123 20150205
Completion Status:
100%
GS-2014B-Q-48 Graham CA/US Astrometry of Beta Pic with GPI GPI 3.30
Execution Status: Dates Taken:
20150124 20150423 20150430
Completion Status:
67%
GS-2014B-Q-49 Hayward GS Deep GeMS/GSAOI Imaging of the Orion Nebula Cluster GSAOI+GeMS Adaptive Optics 6.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2014B-Q-50 Hillwig CL/GS/US Determining Stellar Parameters of Eclipsing Binary Central Stars of Planetary Nebulae GMOS-S 15.20
Execution Status: Dates Taken:
20141125 20150117 20150118 20150121 20150318 20150513 20150515 20150516 20150608 20150621
Completion Status:
96%
GS-2014B-Q-51 Howell CA/US The LCOGT Supernova Key Project (South) GMOS-S 15.00
Execution Status: SToO Dates Taken:
20141104 20141124 20141125 20141126 20150113 20150115 20150125 20150204
Completion Status:
59%
GS-2014B-Q-52 Kannappan US REsolved Spectroscopy Of a Local VolumE:\\ The RESOLVE Survey in Stripe 82 GMOS-S 17.00
Execution Status: Dates Taken:
20140827 20140919 20140920 20140925 20141001 20141123 20141124 20141125 20141226 20141227 20141228 20150103 20150122 20150123
Completion Status:
27%
GS-2014B-Q-53 Kuncarayakti CL GMOS-S IFU spectroscopy of nearby supernova explosion sites GMOS-S 9.00
Execution Status: complete Dates Taken:
20141013 20141014 20141028 20141125 20141201 20141219 20141220 20141223 20141224 20141225 20141229 20150118
Completion Status:
100%
GS-2014B-Q-54 Lira CL Reverberation Mapping of high-z QSOs: the final stages Flamingos2 1.50
Execution Status: Dates Taken:
Completion Status:
0%
GS-2014B-Q-55 Lorenzo de Oliveira BR Chromospheric Activity in Old Open Cluster: NGC 2243 GMOS-S 6.60
Execution Status: complete Dates Taken:
20141020 20141021 20141023 20141024 20141122 20141223 20141224 20150113 20150117 20150119 20150307
Completion Status:
100%
GS-2014B-Q-56 Marois CA/US GPI detailed spectroscopic and astrometric characterization of HR 8799cde. GPI 10.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2014B-Q-57 Milisavljevic US A Search For Time-Varying Diffuse Interstellar Bands in Moderate Resolution Supernova Spectra (South) GMOS-S 4.00
Execution Status: SToO Dates Taken:
Completion Status:
0%
GS-2014B-Q-58 Moskovitz US Mission Accessible Near-Earth Objects Survey (MANOS) (South) GMOS-S 6.50
Execution Status: SToO Dates Taken:
20141122 20141123 20141124 20150122 20150123 20150202
Completion Status:
85%
GS-2014B-Q-59 Piatti AR Unveiling the origin of the LMC clusters NGC1928 and NGC1939 GMOS-S 3.00
Execution Status: Dates Taken:
20141014 20141018 20150115 20150116 20150214 20150215
Completion Status:
28%
GS-2014B-Q-60 Posselt US Confirming a substellar companion candidate around a neutron star Flamingos2 5.70
Execution Status: complete Dates Taken:
20141115 20141204 20141211 20150101 20150113
Completion Status:
100%
GS-2014B-Q-61 Rogerson CA Spectroscopic monitoring of high-velocity rapidly-varying BAL quasars GMOS-S 13.40
Execution Status: SToO Dates Taken:
20140827 20141026 20141028 20141029
Completion Status:
14%
GS-2014B-Q-62 Salter AU Imaging and Spectroscopy of Long Period Companions to Doppler Planet Search Stars GPI 7.00
Execution Status: Dates Taken:
20150119 20150124 20150125
Completion Status:
27%
GS-2014B-Q-63 Schirmer AU/GS/US Characterizing quasar ionization echoes - towards long-term AGN light curves (South) GMOS-S 24.30
Execution Status: Dates Taken:
20140711 20140712 20140718 20140719 20140821 20140822 20140904 20141105 20141106 20141112 20150331 20150401 20161231
Completion Status:
49%
GS-2014B-Q-64 Stubbs US Spectroscopy of Galaxies in Massive Clusters: \\ Galaxy Properties and Dynamical \\ Cluster Mass Calibration GMOS-S 20.00
Execution Status: Dates Taken:
20141012 20141114 20141118 20141121 20150124 20150220 20150429 20150626
Completion Status:
2%
GS-2014B-Q-65 Wright CA Unveiling the Inner Regions of Circumstellar Envelopes and Winds of AGB Stars GPI 6.00
Execution Status: Dates Taken:
20150117
Completion Status:
41%
GS Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GS-2014B-Q-66 Becerra Gonzalez CL Revealing the nature of unidentified gamma-ray sources (South) GMOS-S 3.40
Execution Status: complete Dates Taken:
20140821 20140826 20140827 20140904 20140906 20140916 20140918 20140928 20141013
Completion Status:
100%
GS-2014B-Q-67 Beers GS/US Missing metal-poor stars from the HK and Hamburg/ESO Surveys (South) GMOS-S 55.00
Execution Status: complete Dates Taken:
20140629 20140827 20140829 20140903 20140904 20140906 20140922 20140925 20140927 20140928 20140929 20141001 20141003 20141006 20141009 20141010 20141011 20141012 20141013 20141014 20141019 20141023
Completion Status:
100%
GS-2014B-Q-68 Bosch AR Tracking massive binary frequency in different environments GMOS-S 8.80
Execution Status: Dates Taken:
20141219 20150307
Completion Status:
3%
GS-2014B-Q-69 Bussmann US Completing Gemini-South Optical Imaging of ALMA Lensed SMGs Discovered by Herschel GMOS-S 4.40
Execution Status: complete Dates Taken:
20140927 20141003 20141014 20141018 20141023 20141025 20141119 20141122
Completion Status:
100%
GS-2014B-Q-70 Clayton US Using 16O/18O to Determine the Evolutionary History of the R Coronae Borealis Stars Flamingos2 14.30
Execution Status: Dates Taken:
Completion Status:
0%
GS-2014B-Q-71 de Souza Angelo BR Multi-object spectroscopy of open cluster remnants: the cases of ESO425-SC15 and Ruprecht 3 GMOS-S 3.00
Execution Status: complete Dates Taken:
20150103 20150122 20150123 20150302 20150303 20150304 20150306 20150314 20150318 20150319 20150331
Completion Status:
100%
GS-2014B-Q-72 Gagné CA Spectroscopic confirmation of very low-mass stars, brown dwarfs and planetary-mass candidates in nearby, young moving groups (South) Flamingos2 / GMOS-S 30.00
Execution Status: complete Dates Taken:
20140721 20140729 20140801 20140802 20140803 20140804 20140904 20140906 20140916 20140917 20140920 20140926 20140927 20140929 20141001 20141002 20141003 20141006 20141012 20141019 20141113 20141121
Completion Status:
100%
GS-2014B-Q-73 Gelino US Photometric Follow-up of AllWISE Brown Dwarf Candidates Flamingos2 16.80
Execution Status: complete Dates Taken:
20140929 20141002 20141003 20141004 20141007 20141008 20141009 20141010 20141012 20141013 20141019 20141031 20141101 20141103 20141106 20141201 20141202
Completion Status:
100%
GS-2014B-Q-74 Hernandez-Jimenez BR Could flattened metallicity gradients of interacting galaxies be due to falling gas from the galactic disk ? GMOS-S 3.10
Execution Status: Dates Taken:
20140919 20140926 20141113 20150103 20150105 20150630
Completion Status:
63%
GS-2014B-Q-75 Homan US The puzzling mass donor in the Galactic halo X-ray binary MAXI J0556-332 GMOS-S 3.10
Execution Status: Dates Taken:
20150226 20150413 20150422 20150613
Completion Status:
44%
GS-2014B-Q-76 Knight US Multi-scale investigation of the coma of comet 67P/Churyumov-Gerasimenko: Combined Gemini and Rosetta study of early activity GMOS-S 12.50
Execution Status: Dates Taken:
20140921 20141029 20141110 20141111 20141112 20141113 20141115 20141116 20141117 20141118 20141119
Completion Status:
40%
GS-2014B-Q-77 Mendes de Oliviera BR Stars outside galaxies: a census of intergalactic HII regions in the tidal debris of the merger galaxy Arp284 GMOS-S 8.10
Execution Status: complete Dates Taken:
20140826 20140926 20141013 20141014 20141128 20141129 20150115 20150116 20150117 20150118 20150211 20150213 20150214 20150215 20150216 20150226 20150514 20150606
Completion Status:
100%
GS-2014B-Q-78 Parisi CL Accurate Ages, Metal Abundances and Kinematics of a Large Sample of Small Magellanic Cloud Star Clusters and Surrounding Fields GMOS-S 11.00
Execution Status: Dates Taken:
20140919 20140925 20140926 20141001 20141010 20141023 20141026 20141103 20141222 20141223 20150103 20150107 20150307 20151123
Completion Status:
44%
GS-2014B-Q-79 Peixinho CL Searching for the primordial proto-planetary gradient through cis-Plutino resonant Kuiper Belt Objects GMOS-S 6.20
Execution Status: complete Dates Taken:
20140920 20140922 20141001 20141012 20141018
Completion Status:
100%
GS-2014B-Q-80 Pinilla-Alonso US Near-Infrared photometry of BOs and Centaurs in support of Spitzer Space Telescope data Flamingos2 17.50
Execution Status: complete Dates Taken:
20140802 20140803 20140804 20140916 20140922 20141029 20141030 20141031 20141101 20141105 20141106 20141107 20141116 20141130 20141209 20141212 20141213 20141214
Completion Status:
100%
GS-2014B-Q-81 Richtler GS Isolated ellipticals - key objects for the dark matter problem? GMOS-S 12.00
Execution Status: Dates Taken:
20140826 20141018 20141121 20141122 20141201 20141227 20141228 20150112 20150116 20150122 20150123 20150202 20150213
Completion Status:
70%
GS-2014B-Q-82 Rodriguez CL Characterizing Young Stars Near the Earth GMOS-S 10.00
Execution Status: Dates Taken:
20140717 20140718 20140826 20141006 20141009 20141109 20141112 20141113 20141114 20141221 20150105 20150107 20150115
Completion Status:
99%
GS-2014B-Q-83 Sweet AU Falling rotation curves in tidal dwarf galaxies GMOS-S 14.00
Execution Status: Dates Taken:
20140822 20140919 20141001 20141002 20150103
Completion Status:
20%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 12:48:00 GMT