Queue Summary : Semester 2009B GS

The queues shown in the tables below summarise the programs that have been awarded time on GS. Jump directly to the queue for:

The queue is constructed by the International TAC from the ranked list of proposals of each National TAC using the merging sequence and is divided into three scientific ranking bands (SRBs). Joint proposals (submitted to more than one NTAC for joint support) were combined by the ITAC, are shown in the table as a single entry and are executed as such. Several proposals have multiple occurrences as they were sub-divided by the relevant NTAC; each component is executed separately.

Within each band, all proposals are assumed to have equal scientific merit and have been sorted by PI name for convenience. The choice of which observation within which program to execute next depends on the match to current observing conditions, the balance of each partner's usage and other factors such as future accessibility, whether a program has been started etc. (see a detailed discussion in Puxley 1997; Gemini Preprint #19). The aim is to exhaust band 1 (highest ranked) programs before moving onto band 2 and so on. An observation in band 1 that does not require the best conditions will nevertheless be executed in preference to a band 2 observation even if the latter is a better match. Thus the likelihood of execution decreases from band 1 through to band 3. Bands 1 through 3 aim to fill the nominal queue time available (excluding weather loss). Hence programs in band 3 overfill the queue and provide flexibility with respect to weather conditions and foreseen or unforeseen problems.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.

Note that individual SRBs will not be in detailed balance with respect to partner shares. Aggregating over two or more bands generally provides an equitable distribution of queue loading (in hours, not in the number of proposals) once any classically-scheduled programs are taken into account. Additional flexibility is available when executing observations to balance the partner usage of time. The intent is to achieve balance over 2 or 3 semesters, not a single semester.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2009B-DD-1 Orton DD The Thermal and Compositional Evolution of the Site of the 2009 June 19 Impact in Jupiter: T-Recs imaging and high-resolution spectroscopy TReCS 9.00
Execution Status: complete Dates Taken:
20090805 20090809
Completion Status:
100%
GS-2009B-DD-2 Heinke DD The Second Luminous Transient X-ray Binary in the Globular Cluster NGC 6440 GMOS-S 1.00
Execution Status: complete Dates Taken:
20090901
Completion Status:
100%
GS-2009B-DD-3 Michaud DD Gemini Legacy Imaging 2009B GMOS-S 2.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-1 Andrews US A Comprehensive Study of Dust Formation in Type II Supernovae with HST, Spitzer and Gemini GMOS-S 10.20 [r10B]
Execution Status: complete / rollover Dates Taken:
20090804 20090827 20090828 20090913 20090921 20090923 20091013
Completion Status:
100%
GS-2009B-Q-2 Barrientos CL Mass calibration and gas physics for ACT SZ clusters GMOS-S 20.00 [r10B]
Execution Status: complete / rollover Dates Taken:
20090827 20090830 20090831 20090901 20090910 20091121 20091124 20091125 20091126 20091128 20091207 20091209
Completion Status:
100%
GS-2009B-Q-3 Bersier UK The Supernovae of Gamma-Ray Bursts: Exploring the diversity of stellar explosions GMOS-S 6.00
Execution Status: SToO Dates Taken:
20090808 20090810
Completion Status:
0%
GS-2009B-Q-4 Bosch AR Binary Statistics in 30 Doradus GMOS-S 7.00
Execution Status: complete Dates Taken:
20091223 20091225 20091226 20091227 20100101 20100104 20100108 20100109 20100111 20100113 20100115
Completion Status:
100%
GS-2009B-Q-5 Tanvir AU/CA/CL/UK Rapid observations of gamma-ray bursts with Gemini-S GMOS-S 13.00
Execution Status: RToO Dates Taken:
20090812 20090903 20091018 20091019 20091025 20091029 20091109 20091110 20091111 20091119 20091207 20091216 20091219 20091222 20100114 20100118 20100124 20100126 20100128
Completion Status:
100%
GS-2009B-Q-6 Davidson US Eta Carinae's Continuing Instability and Recovery -- The 2009 ``Event'' GMOS-S 2.50
Execution Status: complete Dates Taken:
20090806 20100108 20100113 20100119 20100120
Completion Status:
100%
GS-2009B-Q-7 De Buizer US Searching for the Massive Stars Associated with Methanol Maser Rings (T-ReCS) TReCS 6.20 [r10B]
Execution Status: complete / rollover Dates Taken:
20090729 20090827 20090828 20090829
Completion Status:
100%
GS-2009B-Q-8 Gladstone UK The optical counterpart of the ultraluminous X-ray source NGC 253 ULX2 GMOS-S 1.70 [r10B]
Execution Status: complete / rollover Dates Taken:
20090806 20090914 20090919
Completion Status:
100%
GS-2009B-Q-9 Stritzinger CL Early and late phase spectroscopic study of supernovae in the Local Universe by the Chilean Millennium Center for Supernova Studies GMOS-S 10.00
Execution Status: RToO Dates Taken:
20091117 20091121 20091122 20091126 20091205 20091220 20091225 20100117 20100118 20100128 20100129
Completion Status:
89%
GS-2009B-Q-10 Hayward GS NICI Imaging of Planetary-Mass Objects in the Orion Nebula NICI 7.00
Execution Status: Dates Taken:
20100117 20100202
Completion Status:
75%
GS-2009B-Q-11 Howell UK/US UV and Early-time Studies of the Evolution of Type Ia Supernovae GMOS-S 8.00
Execution Status: SToO Dates Taken:
20091021 20091030 20091031 20091105 20091106
Completion Status:
18%
GS-2009B-Q-12 Hoyer CL Search for unseen companions around 4 transiting planets using Transit Timing Variations.(III) GMOS-S 23.00
Execution Status: Dates Taken:
20091218 20091225 20091228 20091229 20100116 20100121
Completion Status:
53%
GS-2009B-Q-13 Kasliwal US Transients in the Local Universe GMOS-S 5.00
Execution Status: RToO Dates Taken:
20090709
Completion Status:
45%
GS-2009B-Q-14 Marois CA/GS/UK/US A NICI Search of Jupiter-like Planets Around HR 8799 and Young & Nearby Stars. NICI 25.30
Execution Status: Dates Taken:
20091121 20091122 20091130 20091201 20091209 20091210 20091211 20091226 20091227 20091230 20091231 20100102 20100103 20100106 20100111 20100113 20100114 20100117
Completion Status:
69%
GS-2009B-Q-15 Matheson US CluLeSS: Cluster and Lensed Supernova Search GMOS-S 15.20
Execution Status: SToO Dates Taken:
20100115 20100116 20100117
Completion Status:
48%
GS-2009B-Q-16 Mohr US Spectroscopic Confirmation and Dynamical Mass Estimates of South Pole Telescope SZE Selected Galaxy Clusters GMOS-S 42.60 [r10B]
Execution Status: complete / rollover Dates Taken:
20090910 20090913 20090919 20090921 20091019 20091107 20091114 20091115 20091121 20091122 20091123 20091207 20091208 20091209 20091210 20091211 20091212 20091219 20091222 20091223 20100113 20100114 20100715 20100716 20100727 20100804 20100806 20100813 20100814 20100815 20100817 20100818 20100819 20100907 20100908 20100909 20100910
Completion Status:
100%
GS-2009B-Q-17 National Office UK Gemini Outreach Proposal GMOS-S 1.00
Execution Status: SToO Dates Taken:
Completion Status:
0%
GS-2009B-Q-18 Pastorello UK The PS1 core-collapse supernova survey: deaths of very massive stars GMOS-S 5.00
Execution Status: SToO Dates Taken:
20100127
Completion Status:
31%
GS-2009B-Q-19 Pastoriza BR Mid-IR Observations of the AGN's NGC1808 and ngc1365 TReCS 3.50
Execution Status: complete Dates Taken:
20090827 20090828 20090829
Completion Status:
100%
GS-2009B-Q-20 Roberts UK Constraining the mass of the black hole within NGC 1313 X-2 GMOS-S 29.20 [r10B]
Execution Status: complete / rollover Dates Taken:
20090804 20091023 20091105 20091211 20091212 20091213 20091214 20091215 20091216 20091220 20091221 20091222 20091223 20091224
Completion Status:
100%
GS-2009B-Q-21 Roe US Titan methane weather at Equinox: \\ Seasonal climate change and surface geology NICI 4.00
Execution Status: SToO Dates Taken:
20100120 20100129 20100217 20100218 20100228
Completion Status:
70%
GS-2009B-Q-22 Sinnott CA Optical Spectroscopy of the Light Echo System of SN1987A GMOS-S 3.00 [r10B]
Execution Status: complete / rollover Dates Taken:
20090806 20091118 20091208 20091211 20091213 20091215 20091217 20091221 20100207
Completion Status:
100%
GS-2009B-Q-23 Smith US IR Variability of Eta Carinae: The 2009 Event Phoenix / TReCS 12.00 [r10B]
Execution Status: complete / rollover Dates Taken:
20100328 20100329 20100404 20100405 20100608 20100701 20101230
Completion Status:
100%
GS-2009B-Q-24 Valenti US Simultaneity of Accretion and Outflow in Young Stars Phoenix 4.90
Execution Status: complete / SToO Dates Taken:
20091205 20091212
Completion Status:
100%
GS-2009B-Q-25 Willott CA z=6 quasars to probe the reionization of the universe GMOS-S 6.00
Execution Status: complete / SToO Dates Taken:
20090913 20091013 20091014 20091112 20091217 20091218
Completion Status:
100%
GS-2009B-Q-26 Wilson CA/US The Gemini Cluster Astrophysics Spectroscopic Survey (GCLASS) GMOS-S 34.00
Execution Status: complete Dates Taken:
20090727 20090731 20090827 20090828 20090917 20090923 20091010 20091019 20091023 20091105 20091106 20091107 20091112 20091115 20091116 20091117 20091118 20091121 20091122 20091123 20091210 20091212 20091213 20091214 20091215 20091216 20091217 20091218 20091221 20091222 20100226
Completion Status:
100%
GS-2009B-Q-27 Wittenmyer AU Atmospheric Transmission Spectroscopy of WASP-7b Phoenix 5.30
Execution Status: complete Dates Taken:
20091020 20091025 20091030 20091106
Completion Status:
100%
GS-2009B-Q-28 Yang US Galaxy Formation in Action: Resolving the Nature of Newly Discovered Lyman-$\alpha$ Blobs in the Chandra Deep Field South GMOS-S 27.20 [r10B]
Execution Status: rollover Dates Taken:
20101101 20101102 20101103 20101104 20101106 20101112 20101119 20101205 20101206 20101212 20101213 20110108
Completion Status:
65%
GS-2009B-Q-500 Liu AU/CA/GS/GT/UK/US NICI Extrasolar Planet Search Campaign (I) NICI 150.00
Execution Status: Dates Taken:
20091012 20091030 20091031 20091102 20091202 20091203 20091204 20091205 20100105 20100106 20100107 20100109 20100110
Completion Status:
28%
GS-2009B-Q-501 Liu AU/CA/GS/GT/UK/US NICI Extrasolar Planet Search Campaign (II) NICI 150.00
Execution Status: Dates Taken:
Completion Status:
0%
GS Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2009B-Q-29 Bastian GS/UK Testing star cluster disruption scenarios: accurate age distributions GMOS-S 8.40
Execution Status: complete Dates Taken:
20090727 20091010 20091015 20091018 20091031 20091109 20091111 20091115 20091122 20091223 20091224 20091226 20100106
Completion Status:
100%
GS-2009B-Q-30 Berger GS/US Exotic Explosions and Eruptions: Exploring a New Transient Phase-Space with Pan-STARRS GMOS-S 12.00
Execution Status: SToO Dates Taken:
20091012 20091014 20091020 20091021 20091106 20091107 20091112 20091219 20100116 20100119 20100120 20100125
Completion Status:
89%
GS-2009B-Q-31 Bohlender CA Magnetospheric Star-planet Interactions: Contemporaneous Phoenix, XMM, and ESPaDOnS Observations of the Hot Jupiter System HD 179949 Phoenix 20.00
Execution Status: complete Dates Taken:
20091013 20091015 20091017 20091018 20091019 20091021 20091023 20091024 20091031 20091102 20091104 20091105
Completion Status:
100%
GS-2009B-Q-32 Chene CA/UK Very massive binaries in R136: weigh and see! GMOS-S 10.80
Execution Status: complete Dates Taken:
20090806 20091116 20091122 20091210 20091211 20091224 20091225 20091226 20091230 20091231 20100101 20100102 20100103 20100111 20100112 20100114 20100116 20100117 20100118 20100120 20100129 20100131 20100202 20100209 20100210 20100211 20100214 20100215
Completion Status:
100%
GS-2009B-Q-33 Christensen GS Characterizing the Nature of Hyper-luminous Supernovae GMOS-S 7.80
Execution Status: SToO Dates Taken:
20091019 20091108 20091109 20091211 20100116 20100117 20100118 20100120
Completion Status:
61%
GS-2009B-Q-34 Collins UK Star Formation and AGN Activity in the Most Distant X-ray Cluster GMOS-S 12.00
Execution Status: complete Dates Taken:
20090726 20090810 20090811 20090812 20090813 20090820 20090823 20090824 20090905 20090907 20090910 20090913 20090914 20090918 20090922 20090923 20091013
Completion Status:
100%
GS-2009B-Q-35 Conselice UK The Nature of Morphologically Asymmetric Galaxies at z~1.5 GMOS-S 13.10
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-36 Cunha US Chemical Evolution in the Inner Galactic Disk: Abundances in Red Giants of the Massive Cluster GLIMPSE13 Phoenix 24.00
Execution Status: complete Dates Taken:
20090802 20090803 20090809 20090810 20090811 20090812 20090823 20090825 20090826
Completion Status:
100%
GS-2009B-Q-37 da Silva US Shining Light on a Pair of Merging Galaxies GMOS-S 2.70
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-38 Duchene US Probing the nature of optically obscured companions to young stars Phoenix 4.50
Execution Status: complete Dates Taken:
20091205 20091210 20091212 20091214 20091215 20091216 20091217 20091218 20091220
Completion Status:
100%
GS-2009B-Q-39 Gimeno AR/BR/CL/GS Unveiling the hidden core kinematics of NGC 253 Phoenix 16.00
Execution Status: Dates Taken:
20090916 20091026 20091102 20091105 20091227 20100101 20100102 20100103 20100105 20100127 20100131
Completion Status:
69%
GS-2009B-Q-40 Stritzinger CL Early and late phase spectroscopic study of supernovae in the Local Universe by the Chilean Millennium Center for Supernova Studies GMOS-S 10.00
Execution Status: SToO Dates Taken:
20090809 20090914 20091020 20091116 20091117 20091122 20091218 20100106 20100110
Completion Status:
100%
GS-2009B-Q-41 Hanes AR/AU/CA/UK/US Globular Clusters as Probes of Galaxy Formation: The Isolated Elliptical NGC 720 GMOS-S 13.80
Execution Status: complete Dates Taken:
20090804 20091114 20091117 20091122 20091123 20091208 20091211 20091215 20091223 20100106 20100107 20100108 20100109 20100111 20100205 20100209 20100210 20100211
Completion Status:
100%
GS-2009B-Q-42 Heinke CA Ultracompact Orbital Periods in the Globular Cluster NGC 6652 GMOS-S 6.50
Execution Status: Dates Taken:
20090802
Completion Status:
-0%
GS-2009B-Q-43 Levenson US Testing AGN Unification through IR Spectral Energy Distributions--South TReCS 1.70
Execution Status: complete Dates Taken:
20090828 20090919
Completion Status:
100%
GS-2009B-Q-44 Lu CA/UK Galaxy Transformation in Groups within the Accretion Zone of Clusters GMOS-S 18.70
Execution Status: Dates Taken:
20090716 20090724 20090725 20090727 20090728 20091010 20091105 20091112 20091121
Completion Status:
6%
GS-2009B-Q-45 Malo CA/GS Radial Velocity of Low-mass Candidate Members of Nearby Young Associations Phoenix 29.00
Execution Status: complete Dates Taken:
20090826 20090830 20090831 20090901 20090915 20090917 20091012 20091014 20091020 20091024 20091025 20091030 20091104 20091108 20091112 20091113 20091114 20091115 20091116 20091202 20091205 20091219 20091220 20091221 20091224 20091226 20091227 20091228 20100112
Completion Status:
100%
GS-2009B-Q-46 Orton GS/US First Thermal Maps of the Stratosphere of Uranus: Follow-up to Detection of Rotational Variability by the Spitzer IRS TReCS 12.00
Execution Status: complete Dates Taken:
20090829 20090918 20090919 20090920 20090922
Completion Status:
100%
GS-2009B-Q-47 Proctor BR Probing the dynamics in the outskirts of a Hickson compact group GMOS-S 5.70
Execution Status: complete Dates Taken:
20090824 20091014 20091017 20091020 20091105 20091108 20091115
Completion Status:
100%
GS-2009B-Q-48 Rajagopal US The circumbinary disk and environs of post-AGB stars at high resolution and deep contrast NICI 5.00
Execution Status: complete Dates Taken:
20091210 20091211 20091212 20091213 20091231 20100102 20100111 20100315
Completion Status:
100%
GS-2009B-Q-50 Unda-Sanzana CL Combined Doppler Tomography and Eclipse Mapping of Cataclysmic Variable Stars GMOS-S 6.00
Execution Status: complete Dates Taken:
20091229 20091231 20100101 20100102 20100103 20100104
Completion Status:
100%
GS-2009B-Q-51 Valenti UK The PS1 core-collapse supernova survey: explosion rates GMOS-S 10.00
Execution Status: SToO Dates Taken:
Completion Status:
0%
GS-2009B-Q-52 van de Ven GS GMOS integral-field spectroscopy of Fornax dwarf elliptical galaxies: an integral picture of galaxy formation and evolution GMOS-S 8.00
Execution Status: complete Dates Taken:
20090729 20090731 20091017 20091019
Completion Status:
100%
GS-2009B-Q-53 Vieira US A New Population of Strongly-Lensed High-Redshift Sub-Millimeter Galaxies GMOS-S 11.50
Execution Status: complete Dates Taken:
20090804 20090827 20090920 20091024 20091111 20091123 20091211 20091213 20091217 20091218 20091219 20091220
Completion Status:
100%
GS-2009B-Q-54 Westmoquette UK Starburst-driven outflows and feedback in the BCD galaxy NGC1140 GMOS-S 16.70
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-55 Yeh CA/GS Stellar Wind-Ambient Cloud Interactions in 30 Doradus Phoenix 19.00
Execution Status: complete Dates Taken:
20091113 20091115 20091123 20091216 20091230 20100103 20100104 20100107 20100108 20100109
Completion Status:
100%
GS-2009B-Q-56 Yong AU Oxygen isotope ratios in thin and thick disk stars Phoenix 5.90
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-94 Alves-Brito AU Chemical abundances in the second parameter globular cluster pair NGC288/362 Phoenix 5.90
Execution Status: complete Dates Taken:
20090804 20090806 20090901 20091012
Completion Status:
100%
GS Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GS-2009B-Q-57 Allam CA GMOS follow-up of 8 very bright spectroscopically confirmed, group-scale lenses GMOS-S 10.00
Execution Status: Dates Taken:
20090912 20090917 20091014 20091015
Completion Status:
7%
GS-2009B-Q-58 Artigau CA/GS SIMP0136+0933, a Rosetta stone to understand early-T-dwarfs? -- GMOS spectroscopy GMOS-S 12.40
Execution Status: Dates Taken:
20090804
Completion Status:
0%
GS-2009B-Q-59 Barnes US Star Formation Activity and Stellar Populations in the Outer Disk of a Sample of ``Normal'' Spiral Galaxies GMOS-S 35.00
Execution Status: Dates Taken:
20090814 20090826 20091019
Completion Status:
5%
GS-2009B-Q-60 Chavarria CL Studying the envelope properties of high mass protostellar objects TReCS 4.00
Execution Status: Dates Taken:
20090806
Completion Status:
-0%
GS-2009B-Q-61 Cuisinier BR Temperature Fluctuations in IC 418 from Paschen Jump GMOS-S 5.50
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-62 Cure AR/CL Revealing the outflowing disks of B[e] supergiants Phoenix 9.70
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-63 Dobbie AU Probing the stellar initial mass-final mass relation with wide double-degenerate binaries - the southern systems GMOS-S 9.40
Execution Status: Dates Taken:
20091106
Completion Status:
0%
GS-2009B-Q-64 Dodson-Robinson US Planet Formation around Massive Stars NICI 15.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-65 Forte AR The halo-globular cluster connection in the elliptical galaxy NGC 1316 GMOS-S 6.40
Execution Status: complete Dates Taken:
20090825 20090826 20090912 20090913 20091021
Completion Status:
100%
GS-2009B-Q-66 Gimeno GS Unveiling the hidden core kinematics of NGC 253 Phoenix 13.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-67 Stritzinger CL Early and late phase spectroscopic study of supernovae in the Local Universe by the Chilean Millennium Center for Supernova Studies GMOS-S 8.50
Execution Status: complete / SToO Dates Taken:
20090814 20090910 20090912 20090918 20090919 20100105 20100106 20100107 20100112 20100125 20100126 20100128
Completion Status:
100%
GS-2009B-Q-68 Helton US Michelle and T-ReCS Monitoring of Classical Novae TReCS 13.00
Execution Status: Dates Taken:
20090828 20090907 20090918 20090923
Completion Status:
45%
GS-2009B-Q-69 Hoyer CL Search for unseen companions around 4 transiting planets using Transit Timing Variations.(III) GMOS-S 12.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-70 Hrivnak US Testing the Binary Hypothesis for Bipolar Proto-Planetery Nebulae Phoenix 7.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-71 Indriolo US Using H$_3^+$ Observations to Estimate the H$_2$ Temperature Phoenix 9.00
Execution Status: Dates Taken:
20090805 20090830
Completion Status:
51%
GS-2009B-Q-72 Jarvis UK The search for radio sources within the Epoch of Reionization GMOS-S 5.50
Execution Status: complete Dates Taken:
20090807 20090814 20090824 20090825 20090826 20090831 20091014 20091016 20091017
Completion Status:
100%
GS-2009B-Q-73 Lebzelter US The role of stellar variability in mid-IR circumstellar spectra TReCS 18.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-74 Melbourne US Resolving Sources of Mid-IR Flux in Luminous Infrared Disk Galaxies TReCS 30.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-76 Neichel GS Starburst rings, micro-bars and micro-spirals: unveiling the beating heart of Seyfert galaxies with NICI NICI 6.50
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-77 O'Halloran UK Is hardness of the radiation field responsible for the PAH emission deficit in low metallicity dwarf galaxies? TReCS 2.70
Execution Status: complete Dates Taken:
20090804 20090805
Completion Status:
100%
GS-2009B-Q-78 Orton GS Neptune's Wandering Hot Pole TReCS 5.80
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-79 Rodgers GS/US Expanding Herbig Ae/Be Multiplicity Survey to Southern Hemisphere NICI 12.90
Execution Status: Dates Taken:
20091210 20091223 20091231 20100102 20100111 20100113 20100129
Completion Status:
30%
GS-2009B-Q-80 Romer UK The Evolution of X-ray Scaling Relations Over Half A Hubble Time GMOS-S 14.40
Execution Status: Dates Taken:
20090905 20090906 20090907 20091014 20091126 20091211 20091214 20091219 20100115 20100125 20100206
Completion Status:
37%
GS-2009B-Q-81 Rutledge CA Identifying the Nearest and Brightest Neutron Stars GMOS-S 8.80
Execution Status: complete Dates Taken:
20090910 20091024 20091026 20091031 20091107 20091111 20091115
Completion Status:
100%
GS-2009B-Q-82 Sahai US Caught in the Act I: mapping the Collimated Outflows in V Hya, an AGB star evolving into a Bipolar Planetary Nebula Phoenix 6.00
Execution Status: complete Dates Taken:
20091217 20100128 20100129 20100131 20100410 20100422 20100423 20100525
Completion Status:
100%
GS-2009B-Q-83 Sahai US Caught in the Act II: A High-Velocity Outflow in $\pi^1$Gru, an S-type AGB star evolving into a Bipolar Planetary Nebula Phoenix 30.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2009B-Q-84 Salinas CL Is there dark matter in NGC 7507? GMOS-S 15.00
Execution Status: Dates Taken:
20090828 20090916
Completion Status:
40%
GS-2009B-Q-85 Scott US Star Forming Galaxies in the Field of the UV Bright QSO HE2347-4342 GMOS-S 7.00
Execution Status: Dates Taken:
20090717 20090726 20090826
Completion Status:
54%
GS-2009B-Q-86 Soderberg US A New Search for Supersoft Source Ionization Nebulae in the Magellanic Clouds GMOS-S 6.50
Execution Status: complete Dates Taken:
20090803 20090812 20090824 20090825 20090910 20090914
Completion Status:
100%
GS-2009B-Q-87 Tadhunter UK Characterising the host galaxies and environments of luminous type II quasars GMOS-S 20.40
Execution Status: complete Dates Taken:
20090823 20090917 20091020 20091023 20091108 20091112 20091209 20091213 20091214 20091218 20091222 20091223 20091224 20091226 20100107 20100112 20100113 20100221
Completion Status:
100%
GS-2009B-Q-88 Venn CA/US Search for Circumstellar Material around the Ultra Metal-Poor Stars TReCS 16.00
Execution Status: Dates Taken:
20090830 20090916 20090919
Completion Status:
30%
GS-2009B-Q-89 Verma UK The extensive Galaxy Zoo LENsing Survey - eGZeLENS GMOS-S 15.50
Execution Status: SToO Dates Taken:
Completion Status:
0%
GS-2009B-Q-90 Kepler BR The Most Massive DB White Dwarf Candidate GMOS-S 2.30
Execution Status: complete Dates Taken:
20091021 20091106
Completion Status:
100%
GS-2009B-Q-91 Wake UK The environment of luminous red galaxies: the galaxy-halo mass connection at z~0.5 GMOS-S 42.00
Execution Status: complete Dates Taken:
20090806 20090810 20090814 20090826 20090918 20091013 20091028 20091030 20091031 20091104 20091105 20091106 20091107 20091109 20091111 20091112 20091114
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 12:48:00 GMT