[Mayan calendar]

Queue Summary : Semester 2005B GN

The queues shown in the tables below summarise the programs that have been awarded time on GN. Jump directly to the queue for:

The queue is constructed by the International TAC from the ranked list of proposals of each National TAC using the merging sequence and is divided into three scientific ranking bands (SRBs). Joint proposals (submitted to more than one NTAC for joint support) were combined by the ITAC, are shown in the table as a single entry and are executed as such. Several proposals have multiple occurrences as they were sub-divided by the relevant NTAC; each component is executed separately.

Within each band, all proposals are assumed to have equal scientific merit and have been sorted by PI name for convenience. The choice of which observation within which program to execute next depends on the match to current observing conditions, the balance of each partner's usage and other factors such as future accessibility, whether a program has been started etc. (see a detailed discussion in Puxley 1997; Gemini Preprint #19). The aim is to exhaust band 1 (highest ranked) programs before moving onto band 2 and so on. An observation in band 1 that does not require the best conditions will nevertheless be executed in preference to a band 2 observation even if the latter is a better match. Thus the likelihood of execution decreases from band 1 through to band 3. Bands 1 through 3 aim to fill the nominal queue time available (excluding weather loss). Hence programs in band 3 overfill the queue and provide flexibility with respect to weather conditions and foreseen or unforeseen problems.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.

Note that individual SRBs will not be in detailed balance with respect to partner shares. Aggregating over two or more bands generally provides an equitable distribution of queue loading (in hours, not in the number of proposals) once any classically-scheduled programs are taken into account. Additional flexibility is available when executing observations to balance the partner usage of time. The intent is to achieve balance over 2 or 3 semesters, not a single semester.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2005B-DD-1 Song DD Searching for Planets and Planetary System Remnants Michelle / NIRI / NIRI+Altair 10.00
Execution Status: complete Dates Taken:
20060101 20060102 20060103 20060104 20060105 20060107 20060108 20060109 20060114 20060115 20060116 20060117
Completion Status:
100%
GN-2005B-DD-2 Michaud DD Gemini Imaging Legacy GMOS / NIRI / NIRI+Altair 2.50
Execution Status: complete Dates Taken:
20050925 20050926 20050928 20050929
Completion Status:
100%
GN-2005B-DD-3 Weaver DD Adaptive Optics Imaging of the Pluto-Charon System NIRI+Altair 3.00
Execution Status: complete Dates Taken:
20051011 20051012 20051013 20051014 20051015 20051018
Completion Status:
100%
GN-2005B-DD-4 Kudritzki DD Reddening-independent distance to M33 from a detached eclipsing binary. NIRI 3.20
Execution Status: complete Dates Taken:
20060103
Completion Status:
100%
GN-2005B-Q-1 Aspin GS/UH McNeil's Nebula & Young Star: further characterization of the decline to quiescence GMOS / Michelle 8.33
Execution Status: complete Dates Taken:
20050830 20050903 20050907 20050920 20050921 20050925 20051013 20051118 20051119 20051127 20051128 20051223 20051225 20060105 20060216
Completion Status:
100%
GN-2005B-Q-2 Barlow GT Supernovae and the Origin of Dust in Galaxies - Continuation of Long-term Status GN-2005A-Q-20 Michelle 8.00
Execution Status: complete Dates Taken:
20050803 20050822
Completion Status:
100%
GN-2005B-Q-3 Bosch AR Massive stars in NGC 604: where is the next generation? NIRI 6.33
Execution Status: complete Dates Taken:
20050907 20050908 20050911 20051226
Completion Status:
100%
GN-2005B-Q-4 Doyon CA/GS/UK The Gemini Deep Planet Survey (GDPS) NIRI+Altair 51.00
Execution Status: complete Dates Taken:
20050729 20050804 20050805 20050807 20050808 20050809 20050810 20050812 20050814 20050815 20050820 20050821 20050822 20050824 20050825 20050831 20050907 20050908 20050910 20050911 20050912 20050913 20050918 20051002 20051004 20051013 20051016 20051017 20051105
Completion Status:
100%
GN-2005B-Q-5 Eyres GT Midinfrared spectroscopy of Sakurai's Object Michelle 4.00
Execution Status: complete Dates Taken:
20050807 20050815 20050816 20050920
Completion Status:
100%
GN-2005B-Q-6 Team AU/GS/UH/UK/US GRB North GMOS / NIRI 24.00
Execution Status: Dates Taken:
20050814 20050908 20050909 20050910 20051017 20051111 20051221 20051222 20051223 20051224 20051226 20051227 20051228 20051229 20051230 20051231 20060110 20060111 20060119 20060130 20060201 20060204
Completion Status:
97%
GN-2005B-Q-7 Hook CA/UK/US The Nature of Dark Energy from Type Ia Supernovae GMOS 45.00
Execution Status: Dates Taken:
20050803 20050821 20050902 20050903 20050904 20050905 20050906 20050910 20051027 20051028 20051030 20051031 20051101 20051102 20051104 20051105 20051226 20051227 20051228
Completion Status:
84%
GN-2005B-Q-8 Jewitt UH Faint Satellites of the Giant Planets GMOS 15.00
Execution Status: Dates Taken:
20060225 20060306 20060307 20060308 20060429 20060430 20060501
Completion Status:
75%
GN-2005B-Q-9 Kukula UK The evolution of high-redshift quasar host galaxies NIRI 14.60
Execution Status: Dates Taken:
20050810 20050812 20050813 20050815 20050820 20050821 20050823 20050824
Completion Status:
86%
GN-2005B-Q-10 Marinas US Mid-Infrared Imaging of Disks of Transitional Herbig Ae/Be Stars Michelle 9.00
Execution Status: Dates Taken:
20050806 20050816 20051212 20051228 20051229
Completion Status:
95%
GN-2005B-Q-11 Modjaz US Late-Time Spectroscopy of Nearby Type Ib/c Supernovae GMOS 5.30
Execution Status: complete Dates Taken:
20050731 20050813 20051123 20051124
Completion Status:
100%
GN-2005B-Q-12 Najita US Gas in the Giant Planet Region of Disks Michelle 10.00
Execution Status: complete Dates Taken:
20051213 20051220 20051221 20051225 20051226 20051230 20051231 20060106 20060107
Completion Status:
100%
GN-2005B-Q-13 Plana BR The Nature of one large Tidal Dwarfs Candidate in Hickson Group 31 GMOS 4.40
Execution Status: complete Dates Taken:
20051023 20051028 20051129 20051130
Completion Status:
100%
GN-2005B-Q-14 Reid US Searching for planetary-mass companions to the nearest, youngest M dwarfs NIRI+Altair 12.00
Execution Status: complete Dates Taken:
20050805 20050812 20050824 20050825 20050826 20050902 20050903 20050911 20050913 20050918 20050929 20051014 20051015 20051030 20051106 20051116 20051227
Completion Status:
100%
GN-2005B-Q-15 Wyatt GT Probing the Planet Zone of Confirmed Warm Debris Disks Michelle 14.30
Execution Status: complete Dates Taken:
20050806 20050814 20051212 20051219 20051221 20051228 20051230 20051231
Completion Status:
100%
GN-2005B-Q-16 Zijlstra GT Crystalline silicate grains around post-AGB stars Michelle 15.00
Execution Status: complete Dates Taken:
20050826 20050903 20050906 20050910 20051213 20051219 20051222 20051223 20051227 20051229 20060108
Completion Status:
100%
GN Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2005B-DD-5 Miller DD The Formation of a dE Nucleus Caught in the Act GMOS 4.50
Execution Status: Dates Taken:
20051203 20051205 20051206 20051222 20051223
Completion Status:
100%
GN-2005B-Q-17 Balogh UK/US GMOS Integral Field Spectroscopy of E+A Galaxies GMOS 11.10
Execution Status: complete Dates Taken:
20050729 20051028 20051123 20051124 20051128 20051201
Completion Status:
100%
GN-2005B-Q-18 Bersier UK/US The Supernovae of Gamma-Ray Bursts GMOS 24.60
Execution Status: Dates Taken:
20050806 20050925 20050926 20050929
Completion Status:
21%
GN-2005B-Q-19 Burleigh UK Imaging planets around white dwarfs NIRI 19.00
Execution Status: complete Dates Taken:
20050825 20050827 20050828 20050829 20050904 20050926 20051018 20051113 20051114 20051115 20051116 20051120 20051123 20051124 20051220 20051221
Completion Status:
100%
GN-2005B-Q-20 Cruz US The Nearest and Coolest L dwarfs---how near and how cool? GMOS 3.00
Execution Status: complete Dates Taken:
20051013 20051016 20051022 20051030 20051104 20051118 20051127
Completion Status:
100%
GN-2005B-Q-21 De Buizer GS Multi-Wavelength Mid-Infrared Imaging and SED Modeling of High Mass Protostellar Object IRAS 20126+4104 Michelle 2.75
Execution Status: complete Dates Taken:
20050911 20050913
Completion Status:
100%
GN-2005B-Q-23 Gaensicke UK HS2331+3905: A cataclysmic variable in its final days? NIRI 7.50
Execution Status: complete Dates Taken:
20050901 20050909 20050910 20051025
Completion Status:
100%
GN-2005B-Q-24 Gilmore UK Radial Velocity Curves for M-dwarf eclipsing binary systems in open clusters GMOS 13.00
Execution Status: complete Dates Taken:
20051029 20051127 20051202 20051203 20051204 20051231 20060101 20060102 20060103
Completion Status:
100%
GN-2005B-Q-25 Gomez AR Dust Species and Grain Growth in FU Orionis Disks: The Building Blocks of Planets Michelle 7.00
Execution Status: complete Dates Taken:
20050823 20050824 20050825 20051225 20051229
Completion Status:
100%
GN-2005B-Q-26 Goncalves BR The chemical content of nearby galaxies: NGC 147 GMOS 4.00
Execution Status: complete Dates Taken:
20050814 20050926 20051003 20051016 20051029 20051030 20051031 20051101 20051104 20051105 20051108 20051114 20051117 20051127 20051128 20051203 20060726
Completion Status:
100%
GN-2005B-Q-27 Grav UH An Ultradeep Survey of Uranian Irregular Satellites GMOS 21.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-28 Huxor UK Is there dark matter in the newly discovered luminous stellar clusters in the halo of M31? GMOS 12.00
Execution Status: complete Dates Taken:
20050804 20050831 20050923 20050924 20050926 20051028 20051029 20051030 20051201 20060101 20060128 20060130
Completion Status:
100%
GN-2005B-Q-29 Hynes US Echo Mapping a Quiescent Black Hole GMOS 4.00
Execution Status: complete Dates Taken:
20051030 20051102 20051109 20060102 20060104 20060105 20060107 20060108
Completion Status:
100%
GN-2005B-Q-30 Jeffries UK The lithium depletion boundary and absolute ages for young star clusters GMOS 18.50
Execution Status: complete Dates Taken:
20050904 20050923 20050926 20051002 20051004 20051018 20051028 20051029 20051030 20051031 20051101 20051106 20051123 20051127 20051128 20051129 20051202 20051203
Completion Status:
100%
GN-2005B-Q-31 Jensen GS The IR SBF Survey of the Perseus Cluster NIRI 13.60
Execution Status: complete Dates Taken:
20050824 20050826 20050827 20050828 20050829 20050830 20050831 20050925 20050926 20051018
Completion Status:
100%
GN-2005B-Q-32 Kavelaars CA/US Searching for M-dwarf Debris Disks. NIRI / NIRI+Altair 2.00
Execution Status: complete Dates Taken:
20051101 20051221 20051223 20051226
Completion Status:
100%
GN-2005B-Q-33 Kilic US New Old White Dwarfs and the Age of the Galaxy NIRI 15.00
Execution Status: complete Dates Taken:
20050820 20050822 20050823 20050824 20050825 20050827 20050918 20050919 20050924 20050926 20050927 20051102 20051103 20051119 20051120
Completion Status:
100%
GN-2005B-Q-34 Marchis US Refining the Orbits of Known Main-Belt Binary Asteroids NIRI+Altair 3.70
Execution Status: complete Dates Taken:
20051018 20051101 20051105 20051106 20051220 20051221 20060101 20060106 20060108 20060109 20060116 20060117
Completion Status:
100%
GN-2005B-Q-35 Matheson AU/US The ESSENCE Project: Measuring the Equation of State of Dark Energy GMOS 48.30
Execution Status: Dates Taken:
20051028 20051103 20051129 20051130 20060109
Completion Status:
27%
GN-2005B-Q-36 McCabe US Investigating ice processing in edge-on T Tauri disks NIRI 15.30
Execution Status: complete Dates Taken:
20051012 20051204 20060106 20060107 20060108 20060109 20060113 20060114 20060115 20060118 20060129 20060130 20060131 20060203 20060206
Completion Status:
100%
GN-2005B-Q-37 Muzzin CA Photometric Redshifts and the Color-Magnitude Relation of z > 1.3 Galaxy Clusters NIRI 15.00
Execution Status: Dates Taken:
20050917 20050918 20050924 20050926 20050930 20051012 20051013 20051120 20051123 20051124 20060109 20060114 20060118 20060131
Completion Status:
91%
GN-2005B-Q-38 Richer AU/CA/US The End of the Hydrogen Burning Main Sequence in Globular Clusters: M71 NIRI+Altair 22.00
Execution Status: complete Dates Taken:
20050805 20050811 20050812 20050813 20050814 20050815
Completion Status:
100%
GN-2005B-Q-39 Scarano Jr BR Spectroscopic identification of the corotation radius in spiral galaxies GMOS 3.25
Execution Status: complete Dates Taken:
20050801 20050815 20050816 20050827 20050902 20050906 20050907 20050908 20050909 20050910 20050923 20050925 20050926 20051018 20051104 20051105
Completion Status:
100%
GN-2005B-Q-40 Smartt UK NIR imaging of late-type galaxies to identify progenitors of future core-collapse supernovae NIRI 3.20
Execution Status: complete Dates Taken:
20050919
Completion Status:
100%
GN-2005B-Q-41 Stockton UH Investigation of a J-band Dropout Object NIRI 7.00
Execution Status: complete Dates Taken:
20050918 20051013
Completion Status:
100%
GN-2005B-Q-42 Telles BR/GS Near-Infrared Observations of the most extreme HII galaxies NIRI 8.08
Execution Status: complete Dates Taken:
20050802 20050803 20050806 20051113 20051124 20051225 20051229
Completion Status:
100%
GN Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GN-2005B-Q-43 Agol US Searching for Substructure Michelle 1.50
Execution Status: complete Dates Taken:
20050805 20060102
Completion Status:
100%
GN-2005B-Q-44 Agol US Searching for Substructure NIRI 8.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-45 Apai US Resolving Bright Debris Disks with Michelle: Dust after Exoplanetary Collisions Michelle 10.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-46 Balogh CA/UK Measuring the distribution of star formation rates at the epoch of galaxy formation GMOS 21.60
Execution Status: complete Dates Taken:
20050726 20050827 20050928 20050929 20051016 20051017 20051018 20051029 20051030 20051104 20051106 20051123 20051127 20051128 20051207 20051223 20051224 20051225 20051226 20051227 20060106 20060108
Completion Status:
100%
GN-2005B-Q-47 Blum US Signatures of Accretion in the Most Massive Young Stellar Object NIRI 5.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-48 Bouchet US Direct Measurements of Iron Masses Produced in Core-Collapse Supernovae Michelle 11.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-49 Bower UK The dynamics of Ly-alpha Blobs - Evidence for "super-wind" outflows? GMOS 37.50
Execution Status: complete Dates Taken:
20050827 20050828 20050829 20050830 20050902 20050904 20050905 20050907 20050908 20050909 20050910 20050912 20050913 20050927 20050928 20050929
Completion Status:
100%
GN-2005B-Q-50 Brandeker CA Multiplicity and star formation NIRI+Altair 16.00
Execution Status: Dates Taken:
20051115 20051117 20051224 20060116 20060118
Completion Status:
11%
GN-2005B-Q-51 Brown US A Complete Survey of Obscured Quasars GMOS 18.00
Execution Status: Dates Taken:
20050904 20050905 20050906 20050907 20050909 20050910 20050912 20050913 20060112 20060113 20060119 20060120 20060121 20060131 20060201 20060204 20060209
Completion Status:
58%
GN-2005B-Q-52 Bunker UK Fluorescent re-emission of the ionizing UV background from Lyman-limit systems GMOS 30.00
Execution Status: Dates Taken:
20051030
Completion Status:
0%
GN-2005B-Q-53 Churchill US The Galaxy-kinematic Gaseous-halo kinematic connection in Early Epoch Galaxies GMOS 15.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-54 Clayton US Monitoring Type II Supernovae through the Epoch of Dust Formation GMOS / NIRI 11.00
Execution Status: complete Dates Taken:
20050804 20050805 20050910 20050913 20051004 20051016 20051018 20051031 20051130 20060105
Completion Status:
100%
GN-2005B-Q-55 Clewley UK Mapping the Sagittarius tidal debris at 90 kpc from the Galactic center GMOS 37.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-56 Collins UH GMOS Spectroscopic Follow-up of z>1 X-ray Galaxy Clusters GMOS 7.00
Execution Status: complete Dates Taken:
20051102 20051103 20051130 20051201 20051202 20051205 20060110 20060112 20060120 20060121 20060122 20060129 20060130 20060131 20060204 20060215
Completion Status:
100%
GN-2005B-Q-57 Cook US AO Spectroscopy of Charon Between 1.4-2.5 $\mu$m NIRI+Altair 7.50
Execution Status: complete Dates Taken:
20050804 20050807 20050810 20050826 20050829 20050901 20050908 20050911 20050927 20051121
Completion Status:
100%
GN-2005B-Q-58 Cruz UK Finding the most distant radio galaxies: spectroscopy of the faintest 6C** sources GMOS 17.50
Execution Status: Dates Taken:
20060112
Completion Status:
0%
GN-2005B-Q-59 Davidge CA A Search for Intermediate Age Stars Near the Center of M31 NIRI 6.60
Execution Status: complete Dates Taken:
20050903 20050904 20050906
Completion Status:
100%
GN-2005B-Q-60 Ellison CA/UK The Nature of DLA Galaxies Traced Through Spin Temperatures: The Optical Survey GMOS 19.00
Execution Status: complete Dates Taken:
20051030 20051031 20051101 20051102 20051103 20051104 20051129 20051204 20051221 20051222 20051224 20051225
Completion Status:
100%
GN-2005B-Q-61 Ferrarese CA An Exploratory Study of Supermassive Black Holes in Low Surface Brightness Galaxies GMOS 20.30
Execution Status: complete Dates Taken:
20051012 20051013 20051107 20051129 20051218 20051219 20051220 20051223 20051224 20051225 20051226 20060104 20060105 20060106 20060107
Completion Status:
100%
GN-2005B-Q-62 Fitzsimmons US The size and albedo distributions of cometary nuclei GMOS 6.00
Execution Status: complete Dates Taken:
20051129 20051203 20051204 20051226
Completion Status:
100%
GN-2005B-Q-63 Garnett US Stellar Metallicity Distributions and Kinematics in M33 GMOS 26.00
Execution Status: Dates Taken:
20050727 20050801 20050804 20050805 20051103 20051116 20051117 20051201 20051203 20051204 20051205 20060128 20060131 20060201 20060218
Completion Status:
66%
GN-2005B-Q-64 Gies US Binaries Among the Most Massive Stars NIRI+Altair 7.50
Execution Status: complete Dates Taken:
20050803 20050831 20050903 20050909 20050910 20050912 20050913 20050919 20050920
Completion Status:
100%
GN-2005B-Q-65 Jayawardhana CA In search of proto brown dwarfs NIRI 19.80
Execution Status: complete Dates Taken:
20051023 20051127 20051128 20051129 20051206 20051223 20060109 20060110 20060111 20060112 20060113 20060117 20060120
Completion Status:
100%
GN-2005B-Q-66 Kaaret US Spectral lines from an ultraluminous X-ray source GMOS 5.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-67 Kepler BR Spectra of SDSS White Dwarfs GMOS 5.80
Execution Status: complete Dates Taken:
20050926 20051002
Completion Status:
100%
GN-2005B-Q-68 Kotak UK Molecule formation in Ibc/IIn supernovae and dust in the Universe NIRI 6.10
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-69 Lipari AR 3D Spectroscopy of Young BAL QSOs GMOS 6.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-70 Longmore AU Mid-infrared Spectroscopy of a Massive Embedded Protocluster Michelle 5.80
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-71 Lumsden UK Mid Infrared Imaging of Massive Young Stellar Object Candidates Michelle 14.00
Execution Status: complete Dates Taken:
20050924 20050927 20050930 20060104 20060110 20060111
Completion Status:
100%
GN-2005B-Q-72 Morrison UH Gemini-GMOS Spectroscopy of Ultra-faint Radio Galaxies in Cluster Cl0939+4713 GMOS 12.50
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-73 Olsen GS/US Going Deep in M31 NIRI+Altair 17.01
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-74 Pellizza AR The host galaxies of Gamma-Ray Bursts GMOS / NIRI 5.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-75 Rawlings UK Observing the link between black hole growth and galaxy formation NIRI 37.10
Execution Status: Dates Taken:
20050913 20050917 20050918 20050919 20050920 20050924 20050926 20051016 20051017 20051018 20051028 20051030 20051031 20051101 20051102 20051103 20051104 20051106 20051115 20060314
Completion Status:
40%
GN-2005B-Q-76 Reitzel CA/US The G1 Clump and Its Relation to M31's Disk GMOS 27.00
Execution Status: Dates Taken:
20050926
Completion Status:
8%
GN-2005B-Q-77 Richter US A New/Old Technique for Measuring Stellar Magnetic Fields Michelle 27.50
Execution Status: Dates Taken:
Completion Status:
0%
GN-2005B-Q-78 Roe US Seasonal evolution of clouds on Titan and the hunt for cryovolcanism NIRI+Altair 30.00
Execution Status: Dates Taken:
20060102 20060103 20060105 20060106 20060107 20060108 20060109 20060112 20060113 20060116 20060117 20060118 20060119 20060120 20060129 20060131
Completion Status:
25%
GN-2005B-Q-79 Roseboom CA Near-Infared Imaging of E+A galaxies NIRI 7.50
Execution Status: complete Dates Taken:
20050822 20050823 20050912 20050913 20050917 20051014 20051015 20051106 20051107 20051120 20051206 20051220 20051221
Completion Status:
100%
GN-2005B-Q-80 Schulte-Ladbeck US Chemical abundances of the z=0.09 Damped Lyman Alpha Galaxy toward OI~363 GMOS 3.00
Execution Status: complete Dates Taken:
20051028 20051129 20060101 20060102 20060103 20060104
Completion Status:
100%
GN-2005B-Q-81 Thomas US Multiplicity of Herbig Ae/Be stars NIRI / NIRI+Altair 25.00
Execution Status: complete Dates Taken:
20050913 20050919 20050920 20050925 20050926 20050930 20051013 20051014 20051017 20051018 20051028 20051030 20051031 20051101 20051115 20051116 20051117 20051118 20051224 20060116 20060208 20060212 20060213 20060214 20060216 20060305 20060306
Completion Status:
100%
GN-2005B-Q-82 Turner GS GMOS spectroscopy of nearby E+A galaxies GMOS 20.00
Execution Status: complete Dates Taken:
20050825 20050827 20050828 20050830 20050831 20050901 20050904 20050910 20050913 20050930 20051002 20051004 20051012 20051104 20051127
Completion Status:
100%
GN-2005B-Q-83 Wright AU Identifying the 11.2 micron absorption band in embedded sources Michelle 10.50
Execution Status: complete Dates Taken:
20050821 20050823 20050824 20050904 20050905 20050912 20050924 20050927 20051220 20051221
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:47:11 GMT