[Mayan calendar]

Large Program Queue Summary : Semester 2017A GS

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GS.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2017A-LP-1 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 (South) GMOS-S 7.80
Execution Status: Dates Taken:
Completion Status:
0%
GS-2017A-LP-2 Fritz LP XProbing the dark halo of the Milky Way with GeMS/GSAOI GSAOI+GeMS Adaptive Optics 20.40
Execution Status: Dates Taken:
20170314 20170315 20170316 20170317 20170504 20170505 20170510
Completion Status:
59%
GS-2017A-LP-3 Masiero LP Followup of newly discoverd Near-Earth objects from the NEOWISE survey GMOS-S 8.00
Execution Status: SToO Dates Taken:
20170407 20170423 20170601 20170630 20170720 20170721 20170728
Completion Status:
25%
GS-2017A-LP-11 Hsieh LP Observational Characterization of Active Main-Belt Comets and Main-Belt Comet Nuclei (South) GMOS-S 6.13
Execution Status: Dates Taken:
20170327 20170328 20170426 20170429 20170630 20170701 20170718 20170721 20170804
Completion Status:
66%
GS-2017A-LP-12 Monnier LP Scattered Light imaging of YSOs: Probing the Fundamental Stages of Planet Formation GPI 20.00
Execution Status: Dates Taken:
20170406 20170407 20170408 20170410 20170620 20170630 20170702 20170703
Completion Status:
49%
GS Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2017A-LP-5 Buckley-Geer LP Spectroscopic Confirmation and AO imaging Follow-Up of Dark Energy Survey Strong Lensing Systems and Spectra for Photometric Redshift Calibration GMOS-S 12.00
Execution Status: complete Dates Taken:
20170322 20170328 20170329 20170331 20170401 20170421 20170424 20170427
Completion Status:
100%
GS-2017A-LP-6 Chen LP Characterizing Dusty Debris in Exoplanetary Systems GPI 24.80
Execution Status: Dates Taken:
20170420 20170421 20170701
Completion Status:
28%
GS-2017A-LP-8 Hynes LP Dynamical Masses of Black Holes and Neutron Stars from the Galactic Bulge Survey GMOS-S 60.00
Execution Status: Dates Taken:
20170205 20170208 20170312 20170316 20170328 20170405 20170619 20170702 20170718 20170719 20170720 20170721 20170726 20170728 20170801
Completion Status:
28%
GS-2017A-LP-9 Crossfield LP Validating K2’s Habitable and Rocky Planets with AO Imaging (South) Visitor 15.00
Execution Status: Dates Taken:
20170606 20170607 20170609 20170610 20170611 20170612
Completion Status:
52%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 12:42:09 GMT