[Mayan calendar]

Large Program Queue Summary : Semester 2015B GS

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GS.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2015B-LP-1 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 (South) GMOS-S 68.90
Execution Status: Dates Taken:
20150929 20151113 20151115 20151116 20151117 20151118 20151119 20151120 20151121 20160105 20160113 20160131 20160201
Completion Status:
27%
GS-2015B-LP-2 Fritz LP Probing the dark halo of the Milky Way with GeMS/GSAOI GMOS-S / GSAOI+GeMS Adaptive Optics 27.40
Execution Status: Dates Taken:
20150913 20151206 20151222 20160114
Completion Status:
6%
GS-2015B-LP-3 Masiero LP Followup of newly discoverd Near-Earth objects from the NEOWISE survey GMOS-S 8.00
Execution Status: SToO Dates Taken:
20150723 20150903 20151008 20151216 20151226 20160101 20160120 20160122
Completion Status:
34%
GS-2015B-LP-7 Kasliwal LP Rapid Spectroscopy of Elusive Transients and Young Supernovae GMOS-S 4.00
Execution Status: complete / RToO Dates Taken:
20150823 20151223
Completion Status:
100%
GS Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2015B-LP-5 Buckley-Geer LP Spectroscopic Confirmation and AO imaging Follow-Up of Dark Energy Survey Strong Lensing Systems and Spectra for Photometric Redshift Calibration GMOS-S 80.00
Execution Status: Dates Taken:
20151008 20151009 20151010 20151011 20151012 20151122 20151204 20151207 20151208 20151209 20151210 20151214 20151215 20151217 20151229 20160102 20160103 20160112 20160203 20160329
Completion Status:
64%
GS-2015B-LP-6 Chen LP Characterizing Dusty Debris in Exoplanetary Systems GPI 28.00
Execution Status: complete Dates Taken:
20151130 20151201 20151204 20151205 20151206 20161118
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 12:42:09 GMT