Large Program Queue Summary : Semester 2014B GS

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GS.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2014B-LP-1 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 GMOS-S 39.80
Execution Status: Dates Taken:
20140906 20140914 20140928 20140930 20141001 20141013 20141014 20141106 20141112 20141114 20141115 20141116 20141117 20141118 20141119 20141231 20150101 20150222 20150223
Completion Status:
93%
GS-2014B-LP-2 Fritz LP Probing the dark halo of the Milky Way with GeMS/GSAOI GMOS-S / GSAOI+GeMS Adaptive Optics 27.40
Execution Status: complete Dates Taken:
20140907 20140908 20140921 20141029 20141119 20141201 20141203 20141209 20141210 20141211 20150107 20150108 20150109 20150110
Completion Status:
100%
GS-2014B-LP-3 Masiero LP Followup of newly discoverd Near-Earth objects from the NEOWISE survey GMOS-S 8.00
Execution Status: SToO Dates Taken:
20141003 20141006 20141011 20141019 20141028 20141113
Completion Status:
26%
GS-2014B-LP-4 Werk LP Where Accretion Meets Feedback: A Galaxy Redshift Survey in HST/COS Quasar Fields (South) GMOS-S 11.50
Execution Status: complete Dates Taken:
20140928 20141013 20141024 20141025 20141026 20141027 20141028 20141201 20141225 20150124 20150202 20150213 20150214 20150217 20150619 20150623 20150624 20150718 20150821
Completion Status:
100%
GS Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2014B-LP-5 Buckley-Geer LP Spectroscopic Confirmation and AO imaging Follow-Up of Dark Energy Survey Strong Lensing Systems and Spectra for Photometric Redshift Calibration GMOS-S 80.00
Execution Status: Dates Taken:
20141018 20141020 20141021 20141022 20141023 20141024 20141025 20141029 20141114 20141118 20141121 20141219 20141220 20141222 20141223 20141225 20141226 20141231 20150101 20150220 20150224
Completion Status:
68%

 