[Mayan calendar]

Large Program Queue Summary : Semester 2019B GN

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2019B-LP-8 Walsh LP Addressing a Bias in the Relation Between Galaxies and Their Central Black Holes NIFS+Altair / NIFS+AltairLGS 47.50
Execution Status: Dates Taken:
20191022 20191024 20191028 20191029 20200103
Completion Status:
6%
GN-2019B-LP-101 Crossfield LP Validating TESS Exoplanet Candidates NIRI+Altair / Visitor 25.00
Execution Status: SToO Dates Taken:
20191102 20191103 20191105 20191108 20191109 20191113 20191114 20191115 20191121 20191125 20191127 20191128 20191129 20191203 20191204
Completion Status:
35%
GN-2019B-LP-102 Venn LP Chemistry of new metal-poor stars found in the Pristine Survey GMOS 20.00
Execution Status: complete Dates Taken:
20191108 20191109 20191110 20191111 20191112 20191114 20200118
Completion Status:
100%
GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2019B-LP-16 Shemmer LP Placing High-Redshift Quasars in Perspective: a Gemini Near-Infrared Spectroscopic Survey GNIRS 40.30
Execution Status: complete Dates Taken:
20190704 20190712 20190714 20190908 20190930 20191002 20191004 20191018 20191020 20191024 20191025 20191027 20191028 20191029 20191031 20191115 20191116 20191126 20191127 20191129 20191204 20191209 20191210 20191211 20191212 20191216 20191218 20191227 20191228 20191229 20191230 20200101 20200102 20200104
Completion Status:
100%
GN-2019B-LP-201 Trafton LP Monitoring Seasonal Reversal in Uranus' Upper Atmosphere GNIRS 6.00
Execution Status: complete Dates Taken:
20190911 20191005 20191021 20191103
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:42:37 GMT