Large Program Queue Summary : Semester 2019A GN

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2019A-LP-4 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 GMOS 22.80
Execution Status: complete Dates Taken:
20190117 20190129 20190206 20190212 20190213 20190301 20190304 20190406 20190407 20190410 20190424 20190425 20190426 20190427 20190501 20190508 20190509 20190510 20190511
Completion Status:
100%
GN-2019A-LP-8 Walsh LP Addressing a Bias in the Relation Between Galaxies and Their Central Black Holes NIFS+AltairLGS 36.00
Execution Status: Dates Taken:
20190226 20190304 20190419 20190420 20190421 20190422 20190423 20190425 20190426 20190509 20190510 20190512 20190513 20190518 20190519 20190521
Completion Status:
72%
GN-2019A-LP-11 Hsieh LP Observational Characterization of Active Main-Belt Comets and Main-Belt Comet Nuclei GMOS 2.70
Execution Status: complete Dates Taken:
20190204 20190323 20190424 20190613 20190614 20190704 20190706 20190711
Completion Status:
100%
GN-2019A-LP-101 Crossfield LP Validating TESS Exoplanet Candidates NIRI+Altair 10.00
Execution Status: SToO Dates Taken:
20190318 20190322 20190405 20190524 20190526 20190527 20190528 20190529 20190613 20190614 20190615 20190620 20190625
Completion Status:
20%
GN-2019A-LP-102 Venn LP Chemistry of new metal-poor stars found in the Pristine Survey GMOS 40.00
Execution Status: Dates Taken:
20190326 20190327 20190328 20190329 20190330 20190331 20190622 20190626 20190627 20190628
Completion Status:
96%
GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2019A-LP-6 Shemmer LP Placing High-Redshift Quasars in Perspective: a Gemini Near-Infrared Spectroscopic Survey GNIRS 47.36
Execution Status: Dates Taken:
Completion Status:
0%
GN-2019A-LP-16 Shemmer LP Placing High-Redshift Quasars in Perspective: a Gemini Near-Infrared Spectroscopic Survey GNIRS 47.40
Execution Status: complete Dates Taken:
20190121 20190203 20190206 20190226 20190301 20190303 20190308 20190309 20190316 20190317 20190318 20190319 20190321 20190322 20190323 20190415 20190416 20190417 20190418 20190420 20190423 20190424 20190513 20190514 20190518 20190519 20190522 20190523 20190524 20190613 20190614 20190615 20190616 20190617 20190618 20190619
Completion Status:
100%

 