[Mayan calendar]

Large Program Queue Summary : Semester 2018B GN

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2018B-LP-4 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 GMOS 22.50
Execution Status: Dates Taken:
20180913
Completion Status:
0%
GN-2018B-LP-11 Hsieh LP Observational Characterization of Active Main-Belt Comets and Main-Belt Comet Nuclei GMOS 2.30
Execution Status: Dates Taken:
20180907 20180909
Completion Status:
30%
GN-2018B-LP-101 Crossfield LP Validating TESS Exoplanet Candidates GNIRS / NIRI+Altair 5.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2018B-LP-102 Venn LP Chemistry of new metal-poor stars found in the Pristine Survey GMOS 22.30
Execution Status: Dates Taken:
Completion Status:
0%
GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2018B-LP-15 Stanford LP MaDCoWS: The Massive and Distant Clusters of WISE Survey GMOS 4.70
Execution Status: Dates Taken:
20180626 20180906
Completion Status:
0%
GN-2018B-LP-16 Shemmer LP Placing High-Redshift Quasars in Perspective: a Gemini Near-Infrared Spectroscopic Survey GNIRS 46.30
Execution Status: Dates Taken:
20180628 20180629 20180630 20180701 20180830
Completion Status:
2%

 

[Science Operations home] [schedules home]


Last updated on: 21 Sep 2018 17:37:42 GMT