[Mayan calendar]

Large Program Queue Summary : Semester 2017A GN

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2017A-LP-1 Fraser LP COL-OSSOS: COLours for the Outer Solar System Object Survey GMOS / NIRI 50.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2017A-LP-4 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 (North) GMOS 55.90
Execution Status: Dates Taken:
Completion Status:
0%
GN-2017A-LP-11 Hsieh LP Observational Characterization of Active Main-Belt Comets and Main-Belt Comet Nuclei (North) GMOS 6.90
Execution Status: Dates Taken:
Completion Status:
0%
GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2017A-LP-5 Crossfield LP Validating K2’s Habitable and Rocky Planets with AO Imaging (North) NIRI+Altair / NIRI+AltairLGS 15.00
Execution Status: Dates Taken:
20170120 20170127 20170128 20170129 20170219 20170221
Completion Status:
16%
GN-2017A-LP-6 Huitson LP The First Survey Dedicated to the Detection and Characterization of Clouds in Exoplanet Atmospheres GMOS 23.80
Execution Status: Dates Taken:
Completion Status:
0%
GN-2017A-LP-7 Shen LP A GNIRS Near-IR Spectroscopic Survey of z>5.7 Quasars GNIRS 44.40
Execution Status: Dates Taken:
20170118 20170119 20170120 20170204 20170205 20170216 20170219 20170220 20170221
Completion Status:
41%

 

[Science Operations home] [schedules home]


Last updated on: 21 Feb 2017 18:40:18 GMT