[Mayan calendar]

Large Program Queue Summary : Semester 2015B GN

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2015B-LP-1 Fraser LP COL-OSSOS: COLours for the Outer Solar System Object Survey (North) GMOS / NIRI 50.00
Execution Status: complete Dates Taken:
20150918 20150919 20151010 20151012 20151013 20151014 20151015 20151016 20151203 20151205 20151206 20151207 20160103
Completion Status:
100%
GN-2015B-LP-2 Kasliwal LP Rapid Spectroscopy of Elusive Transients and Young Supernovae GMOS 23.10
Execution Status: RToO Dates Taken:
20150908 20151012 20151013 20151023 20151028 20151029 20151101 20151113 20151210 20151213 20151229 20160106
Completion Status:
64%
GN-2015B-LP-3 Huitson LP The First Survey Dedicated to the Detection and Characterization of Clouds in Exoplanet Atmospheres GMOS 6.30
Execution Status: complete Dates Taken:
20150731 20150815 20150817 20150818 20150909 20150910 20151101 20151102 20160720
Completion Status:
100%
GN-2015B-LP-4 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 (North) GMOS 19.50
Execution Status: complete Dates Taken:
20150801 20150803 20151007 20151009 20151218 20160130 20160131
Completion Status:
100%
GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2015B-LP-5 Crossfield LP Validating K2’s Habitable and Rocky Planets with AO Imaging GNIRS+AltairLGS / NIRI / NIRI+Altair / NIRI+AltairLGS / Visitor 20.00
Execution Status: complete Dates Taken:
20151009 20151012 20151015 20151024 20151026 20151101 20151102 20151118 20151123 20151124 20151127 20151202 20151208 20151213 20151214 20151224 20151228 20160113 20160114 20160115 20160116 20160117
Completion Status:
100%
GN-2015B-LP-6 Huitson LP The First Survey Dedicated to the Detection and Characterization of Clouds in Exoplanet Atmospheres GMOS 17.50
Execution Status: Dates Taken:
20151110 20151111 20151214 20151215 20151227 20151229 20160110
Completion Status:
65%
GN-2015B-LP-7 Shen LP A GNIRS Near-IR Spectroscopic Survey of z>5.7 Quasars GNIRS 35.30
Execution Status: complete Dates Taken:
20150901 20150903 20150904 20150905 20150906 20150907 20151103 20151129 20151201 20151202
Completion Status:
100%

 

[Science Operations home] [schedules home]