[Mayan calendar]

Fast Turnaround Queue Summary : Semester 2019A GS

The tables below summarise the programs that constitute the Fast Turnaround program queue on GS.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2019A-FT-101 Papovich US (Completing) Split K-band observations of the Most Extreme Massive Galaxies at High Redshift Flamingos2 10.70
Execution Status: Dates Taken:
20190401 20190403 20190408 20190409 20190411 20190412 20190413 20190415
Completion Status:
100%
GS-2019A-FT-102 Sand US Kinematics of Ultra-Diffuse Galaxy Globular Clusters in the Virgo Cluster: A Pilot Project GMOS-S 5.00
Execution Status: Dates Taken:
20190212 20190216 20190305 20190306 20190308 20190314 20190412
Completion Status:
46%
GS-2019A-FT-103 Swihart US Spectroscopic Monitoring of the Compact Binary FL8Y J0456.2-1634 GMOS-S 2.60
Execution Status: complete Dates Taken:
20190302 20190303
Completion Status:
100%
GS-2019A-FT-104 Levesque US Characterization of a Potential Red Supergiant Binary Companion GMOS-S 2.00
Execution Status: complete Dates Taken:
20190305 20190314 20190315 20190319 20190327 20190410 20190411
Completion Status:
100%
GS-2019A-FT-105 Veilleux US AGN Feedback in Dwarf Galaxies GMOS-S 6.46
Execution Status: Dates Taken:
20190412 20190415
Completion Status:
0%
GS-2019A-FT-106 Shaw CA Determining the nature of Very Faint X-ray Transients Flamingos2 2.80
Execution Status: SToO Dates Taken:
Completion Status:
0%
GS-2019A-FT-107 Paterson US Determing the redshift of GRB181123B Flamingos2 1.50
Execution Status: Dates Taken:
20190410
Completion Status:
100%
GS Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2019A-FT-201 Dennihy US A targeted search for dynamically active planetary systems around dead stars GMOS-S 2.10
Execution Status: complete Dates Taken:
20190126 20190127 20190128 20190204 20190208 20190211 20190225 20190314
Completion Status:
100%
GS-2019A-FT-202 Kilic US Double Degenerates in the Solar Neighborhood GMOS-S 4.10
Execution Status: Dates Taken:
20190412 20190415
Completion Status:
17%

 

[Science Operations home] [schedules home]


Last updated on: 21 Apr 2019 12:33:56 GMT