[Mayan calendar]

Fast Turnaround Queue Summary : Semester 2017B GN

The tables below summarise the programs that constitute the Fast Turnaround program queue on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2017B-FT-1 Fan US Gemini Spectroscopic Confirmations of Three Luminous Reionization-Era Quasars at z=6.5-7.2 GMOS 4.40
Execution Status: Dates Taken:
20170916
Completion Status:
0%
GN-2017B-FT-2 Kilic US The First Double Magnetic White Dwarf Binary GMOS 5.00
Execution Status: complete Dates Taken:
20170910 20170911 20170912
Completion Status:
100%
GN-2017B-FT-5 Blanchard US Nebular Phase Spectrum of an Unusual Superluminous Supernova GMOS 2.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2017B-FT-6 Chene US Microlensing black holes and their masses from Gaia GMOS 2.50
Execution Status: Dates Taken:
Completion Status:
0%
GN-2017B-FT-7 Yoon US Best and Farthest Survey : Searching for Ultra Metal-Poor stars in the Outermost Halo of the Galaxy GMOS 6.30
Execution Status: Dates Taken:
Completion Status:
0%
GN-2017B-FT-8 Schirmer US Characterizing low-redshift Lyman-alpha blobs GMOS 3.50
Execution Status: Dates Taken:
Completion Status:
0%
GN Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2017B-FT-3 Ono JP Extremely large area search for high-redshift metal-poor young galaxies with Subaru/HSC GMOS 3.60
Execution Status: complete Dates Taken:
20170824 20170825 20170828 20170909 20170914 20170920
Completion Status:
100%
GN-2017B-FT-4 Lee JP Determine the velocity dispersion and redshifts of the quadruply lensed quasar PSO J0147+4630 GMOS 1.70
Execution Status: complete Dates Taken:
20170902 20170904
Completion Status:
100%
GN-2017B-FT-9 Wisniewski US Diagnosing New Ultra-Cool Brown Dwarf Candidates NIRI 4.90
Execution Status: Dates Taken:
Completion Status:
0%

 

[Science Operations home] [schedules home]


Last updated on: 24 Sep 2017 18:38:45 GMT