[Mayan calendar]

Fast Turnaround Queue Summary : Semester 2015B GN

The tables below summarise the programs that constitute the Fast Turnaround program queue on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2015B-FT-1 Brandt US Contemporaneous spectra of Chandra-observed BAL quasars GMOS 3.00
Execution Status: complete Dates Taken:
20150905 20150906 20151019 20151028 20151110 20151111 20151115
Completion Status:
100%
GN-2015B-FT-2 Alexander US Near infrared spectroscopy of ultracompact embedded clusters GNIRS 4.00
Execution Status: complete Dates Taken:
20150906 20150914 20150917 20151019 20151023 20151024
Completion Status:
100%
GN-2015B-FT-6 Romani US The Core Dynamics of a SMBHB Host GMOS 2.60
Execution Status: complete Dates Taken:
20151201 20151202
Completion Status:
100%
GN-2015B-FT-7 Kirshner US HST Observations for RAISIN2 made possible by Gemini GMOS 3.90
Execution Status: complete / SToO Dates Taken:
20160107 20160108 20160109
Completion Status:
100%
GN-2015B-FT-9 Cucchiara US GRB150314A: the first GRB hosted by an AGN? GNIRS 2.50
Execution Status: complete Dates Taken:
20151103
Completion Status:
100%
GN-2015B-FT-10 Luhman US Searching for the Bottom of the IMF in IC 348 GNIRS 5.00
Execution Status: complete Dates Taken:
20151026 20151027 20151029 20151030 20151104
Completion Status:
100%
GN-2015B-FT-11 Geballe US Very High Excitation H2 lines in the Orion Molecular Flow GNIRS 2.00
Execution Status: complete Dates Taken:
20151104 20151106 20151108
Completion Status:
100%
GN-2015B-FT-12 de Kleer US Observing Io's volcanoes in eclipse: Eruption temperatures and SO gas content NIRI / NIRI+Altair 3.50
Execution Status: Dates Taken:
20151225
Completion Status:
73%
GN-2015B-FT-16 Wylezalek US Zooming into quasar outflows GMOS 3.00
Execution Status: complete Dates Taken:
20151204 20151213 20151226 20151229 20151231
Completion Status:
100%
GN-2015B-FT-17 Meech UH The "Manx Comets" - A Test of Solar System Dynamics Evolutionary Models GMOS 0.70
Execution Status: complete Dates Taken:
20151204
Completion Status:
100%
GN-2015B-FT-18 Stencel US Epsilon Aurigae at Quadrature - a velocity-based mass ratio GNIRS 0.90
Execution Status: complete Dates Taken:
20151202 20151225 20151227 20160125
Completion Status:
100%
GN-2015B-FT-24 Meech UH Deep Image of Manx 2015 WZ - Testing Solar System Formation Models GMOS 0.40
Execution Status: complete Dates Taken:
20151228 20151230 20151231
Completion Status:
100%
GN-2015B-FT-25 Jayawardhana CA Spectroscopic follow-up of a planetary mass companion candidate NIFS+Altair 3.00
Execution Status: complete Dates Taken:
20160121 20160122 20160123
Completion Status:
100%
GN Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2015B-FT-3 Chapman CA SMGs and the IGM: Precise GNIRS redshifts for z~2.3 SMGs near QSO sightlines GNIRS 6.00
Execution Status: complete Dates Taken:
20150914 20151014 20151015 20151023 20151101 20151102 20151110
Completion Status:
100%
GN-2015B-FT-4 Storchi Bergmann BR Spectral Studies of the New Class of Gamma-Ray Emitting Seyferts GNIRS 4.20
Execution Status: complete Dates Taken:
20150905 20150916 20151111 20151124 20151125
Completion Status:
100%
GN-2015B-FT-5 Ebeling UH GRI imaging of massive galaxy clusters at z>0.5 GMOS 2.00
Execution Status: complete Dates Taken:
20150911 20150912
Completion Status:
100%
GN-2015B-FT-8 Cooke US A Sleeping Giant Awakened: Reignition of AGN Activity, Reborn Star Formation, and a Multiphase Outflow in one of the Largest Radio Galaxies Known GMOS 3.70
Execution Status: Dates Taken:
20151210 20151211
Completion Status:
0%
GN-2015B-FT-13 Ebeling UH GRI imaging of massive galaxy clusters at z>0.5 GMOS 2.00
Execution Status: complete Dates Taken:
20151030 20151101
Completion Status:
100%
GN-2015B-FT-14 Best UH Spectroscopic Follow-up of Two Ultracool Dwarfs GNIRS 3.30
Execution Status: complete Dates Taken:
20151031 20151204 20151213 20151214 20160102 20160104 20160109
Completion Status:
100%
GN-2015B-FT-15 Moody US Dwarf Galaxy Candidates in Void FN8 GMOS 4.10
Execution Status: Dates Taken:
20151227 20160102 20160119 20160120 20160121
Completion Status:
75%
GN-2015B-FT-19 Walker US Extended search for interstellar fullerene ion, and other ion, bands Visitor 2.40
Execution Status: complete Dates Taken:
20151217
Completion Status:
100%
GN-2015B-FT-20 Geballe US An IR Spectroscopic Check-up for V838 Mon GNIRS 1.70
Execution Status: complete Dates Taken:
20151130 20151210 20151226 20151229
Completion Status:
100%
GN-2015B-FT-21 Esplin US Searching for the Bottom of the IMF in Taurus GNIRS 2.60
Execution Status: complete Dates Taken:
20151126 20151127 20151206 20151230 20160101 20160102 20160104
Completion Status:
100%
GN-2015B-FT-22 Romani US GB6 0906+6930: The Dog in the Night-time GNIRS 1.30
Execution Status: complete Dates Taken:
20151203
Completion Status:
100%
GN-2015B-FT-23 Stockton UH Low-z Compact Passive Galaxies as High-z Population Survivors GMOS 2.33
Execution Status: complete Dates Taken:
20151130 20151214 20151228 20151229
Completion Status:
100%
GN-2015B-FT-26 Bannister CA The Redness of A New Extreme Outer Solar System Object GMOS 2.90
Execution Status: complete Dates Taken:
20160107 20160108 20160111
Completion Status:
100%
GN-2015B-FT-27 Shih US The Large Extended Emission-Line Region Around a Low-Excitation Radio Galaxy GMOS 2.20
Execution Status: complete Dates Taken:
20151228 20160106 20160107
Completion Status:
100%
GN-2015B-FT-28 Pike CA Surface color as a source population discriminator for TNOs in the 5:1 Neptune Resonance. GMOS 1.90
Execution Status: complete Dates Taken:
20160214 20160217
Completion Status:
100%
GN-2015B-FT-29 Hermes CA A strongly magnetised, metal-polluted white dwarf GMOS / GMOS+AltairLGS 3.33
Execution Status: complete Dates Taken:
20160308 20160401 20160402
Completion Status:
100%
GN-2015B-FT-30 Jorgensen US Determining the nature of the strong Herschel emission in 5 quiescent galaxy candidates at z=1.6-2.5 GNIRS 6.00
Execution Status: complete Dates Taken:
20160124 20160129 20160315 20160316 20160321 20160322
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:36:29 GMT