[Mayan calendar]

Director's Discretionary Time Summary : Semester 2013B GS

The data shown in the tables below summarise the programs that constitute the "Director's Discretionary Time" (DDT) on GS. DDT proposals are typically for time-critical observations which cannot wait for the normal proposal cycle (e.g. unexpected astronomical events) or for testing the feasibility of a technique or of a program. See the DDT web page for more information. DDT proposals may be submitted at any time by any astronomer world-wide.

In other respects - contact scientist support, Phase II definitions, Gemini Science Archive data distribution - DDT programs are similar to other Gemini queue programs.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2013B-DD-1 Carrasco Gemini Frontier Fields campaign Flamingos2 / GSAOI+GeMS Adaptive Optics 10.00
Execution Status: complete Dates Taken:
20140113 20140114 20140119 20140120 20140122 20140922
Completion Status:
100%
GS-2013B-DD-2 Genzel Observing the central arcsecond in the Galactic Center with Gemini South GSAOI+GeMS Adaptive Optics 2.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2013B-DD-4 Flynn Optical Followup of Fast Radio Bursts GMOS-S 2.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2013B-DD-5 Luhman Spectroscopy of a Candidate Halo T dwarf Flamingos2 0.70
Execution Status: complete Dates Taken:
20131224 20131225
Completion Status:
100%
GS-2013B-DD-6 Farrell Measuring the Redshift of a New Candidate Intermediate Mass Black Hole GMOS-S 1.90
Execution Status: complete Dates Taken:
20131228 20131229 20131230
Completion Status:
100%
GS-2013B-DD-7 Masiero Followup of NEOWISE-discovered Near Earth Objects and Potentially Hazaradous Asteroids Flamingos2 / GMOS-S 3.00
Execution Status: complete / SToO Dates Taken:
20140131 20140203 20140207 20140216 20140226 20140313 20140405 20140428 20140514 20140517 20140709 20140801
Completion Status:
100%
GS Director's Discretionary Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2013B-DD-3 Riess SHOES-II: Measuring the Hubble Constant to 1% with Parallax GMOS-S 23.40 [r14B]
Execution Status: complete / rollover Dates Taken:
20131127 20131130 20131202 20131203 20131205 20131206 20131207 20131214 20131216 20131217 20131223 20131228 20140101 20140103 20140104 20140107 20140108 20140112 20140115 20140116 20140117 20140129 20140130 20140210 20140307 20140822 20140823 20140903 20141029 20141030 20141031 20141103 20141104 20141105 20141109 20141112 20141127 20141128 20141130 20141202 20141219 20141220 20141221 20141231 20150124 20150125 20150204
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 12:29:08 GMT