Director's Discretionary Time Summary : Semester 2019A GN

The data shown in the tables below summarise the programs that constitute the "Director's Discretionary Time" (DDT) on GN. DDT proposals are typically for time-critical observations which cannot wait for the normal proposal cycle (e.g. unexpected astronomical events) or for testing the feasibility of a technique or of a program. See the DDT web page for more information. DDT proposals may be submitted at any time by any astronomer world-wide.

In other respects - contact scientist support, Phase II definitions, Gemini Science Archive data distribution - DDT programs are similar to other Gemini queue programs.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2019A-DD-101 Webb Confimring the X-Ray Detection of a z = 1.7 Galaxy Cluster GMOS 2.50
Execution Status: complete Dates Taken:
20190314 20190408 20190426 20190427
Completion Status:
100%
GN-2019A-DD-102 Silverman Search for binary quasars at close separation NIFS / NIFS+AltairLGS 3.20
Execution Status: complete Dates Taken:
20190226 20190304 20190416 20190417 20190419 20190421 20190422 20190423 20190424
Completion Status:
100%
GN-2019A-DD-103 Gomez Observations of a Peculiar Type-I Pulsational Pair Instability Supernova Candidate GMOS 2.00
Execution Status: complete Dates Taken:
20190304 20190306
Completion Status:
100%
GN-2019A-DD-104 Mann Establishing ages and masses of substellar objects through moving group membership GNIRS 2.00
Execution Status: complete Dates Taken:
20190318 20190409
Completion Status:
100%
GN-2019A-DD-105 Sheppard Urgent Recovery of the Most Distant Objects in Our Solar System GMOS 2.50
Execution Status: complete Dates Taken:
20190403 20190404 20190426 20190501 20190502
Completion Status:
100%
GN-2019A-DD-107 Young The 3D shape of elongaged KBO 1998 BU48 GMOS 4.80
Execution Status: complete Dates Taken:
20190427 20190502 20190507 20190508 20190510 20190511 20190512
Completion Status:
100%
GN-2019A-DD-108 Butko A pilot project for GIRMOS: constraining the existence of an IMBH in Terzan 5 NIFS+AltairLGS 3.00
Execution Status: complete Dates Taken:
20190514 20190517 20190518 20190519 20190521
Completion Status:
100%
GN-2019A-DD-109 Wang GNIRS Peers Deep Into the Reionization with A Newly Discovered Luminous Quasar at z=7.5 GNIRS 6.40
Execution Status: complete Dates Taken:
20190531 20190601 20190602 20190611 20190612 20190613
Completion Status:
100%
GN-2019A-DD-110 Tendulkar The Perplexing Host of the Second Localized Repeating Fast Radio Burst GMOS 2.50
Execution Status: complete Dates Taken:
20190713 20190714 20190902 20190903 20190910 20191029
Completion Status:
100%
GN Director's Discretionary Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2019A-DD-106 Rector Gemini Legacy imaging program GMOS / GMOS-S 1.00
Execution Status: complete Dates Taken:
20190501
Completion Status:
100%
GN-2019A-DD-201 Peterson Testing the interferometric broad-line region radius of 3C 273 with near-IR reverberation GNIRS 2.70
Execution Status: Dates Taken:
20190612 20190629 20190711
Completion Status:
59%

 

[Science Operations home] [schedules home]