[Mayan calendar]

Director's Discretionary Time Summary : Semester 2014B GN

The data shown in the tables below summarise the programs that constitute the "Director's Discretionary Time" (DDT) on GN. DDT proposals are typically for time-critical observations which cannot wait for the normal proposal cycle (e.g. unexpected astronomical events) or for testing the feasibility of a technique or of a program. See the DDT web page for more information. DDT proposals may be submitted at any time by any astronomer world-wide.

In other respects - contact scientist support, Phase II definitions, Gemini Science Archive data distribution - DDT programs are similar to other Gemini queue programs.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2014B-DD-1 Rector Gemini Legacy imaging of HDC 11 GMOS 1.00
Execution Status: complete Dates Taken:
20141001
Completion Status:
100%
GN-2014B-DD-2 Seth Resolving the Most Massive Globular Clusters in the Local Group NIFS+AltairLGS 4.30
Execution Status: complete Dates Taken:
20141006 20141007 20141106 20141109
Completion Status:
100%
GN-2014B-DD-3 Heida J022721.52+333500.7: A ULX containing an intermediate mass black hole? GNIRS / GNIRS+AltairLGS 2.50
Execution Status: complete Dates Taken:
20141023 20141024
Completion Status:
100%
GN-2014B-DD-4 Jorgensen Stellar populations in the Lynx Super Cluster at redshift 1.26 GMOS 18.00
Execution Status: Dates Taken:
20141014 20141021 20141122 20141215 20141216 20141222 20141230 20150101 20150112 20150114 20150121
Completion Status:
40%
GN-2014B-DD-5 Sromovsky NIRI imaging of a possible Great Storm on Uranus NIRI+Altair 1.50
Execution Status: complete Dates Taken:
20141030 20141119 20141126 20150108 20150109
Completion Status:
100%
GN-2014B-DD-6 Ma The Most Massive Black Hole within 100 Mpc GMOS 4.00
Execution Status: complete Dates Taken:
20141122 20141124 20141125 20141126 20141127
Completion Status:
100%
GN-2014B-DD-7 Mason Direct detection of the dust and accretion disk in a low-luminosity AGN GNIRS+Altair 0.80
Execution Status: complete Dates Taken:
20141208
Completion Status:
100%

 