Poor Weather Queue Summary : Semester 2015B GN

The queues shown in the tables below summarise the programs that constitute the "Poor Weather Queue" on GN. The Poor Weather Queue is a pilot program introduced in 2006B to fill telescope time under very poor, but usable, conditions. These programs are distinct from other queue programs in three important ways: 1) time spent on poor weather programs will not be charged to the PIs or the partner countries; 2) poor weather programs can exist in queue only, and must meet the observing condition constraints shown below; and 3) poor weather programs are lower priority than the "regular" queue (bands 1 to 3) and have no explicit or implicit guarantee of being observed. They will be executed only when nothing in the regular queue is observable.

In all other respects — NGO and Gemini contact scientist support, Phase II definitions, Gemini Science Archive data distribution — programs in the Poor Weather Queue are similar to all other Gemini queue programs. In the Observing Tool, poor weather queue programs are designated as Band 4, to distinguish them from the rest of the queue.

Observing condition constraints for poor weather programs must meet one of the following:

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2015B-Q-93 Asplund AU The most metal-rich stars: probing exoplanets, stellar nucleosynthesis, Galactic archaeology, and galaxy evolution Visitor 15.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2015B-Q-94 Kedziora-Chudczer AU Mapping and Characterisation of Jovian Aurora in near infrared bands GNIRS 5.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2015B-Q-95 Manset CA Unveiling the Nature of FS CMa Type Stars GMOS / Visitor 12.50
Execution Status: Dates Taken:
Completion Status:
0%
GN-2015B-Q-96 Yong AU Unveiling the origin of the young [alpha/Fe]-rich stars Visitor 6.70
Execution Status: Dates Taken:
Completion Status:
0%
GN-2015B-Q-99 Ladjal US Gemini/GMOS Planetary Nebulae Survey (GemPlaNS): spatially resolved optical spectroscopy survey of Planetary Nebulae GMOS / GMOS-S 30.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2015B-Q-100 Placco US Identifying Very and Extremely Metal-Poor Stars in the Best & Brightest Catalog GMOS 30.00
Execution Status: Dates Taken:
20151102 20151104 20151108 20151111 20151113 20151115 20151116 20151118 20151122 20151124 20151128 20151216 20151220 20151225 20151228 20160110 20160111 20160112 20160120 20160121 20160122 20160123 20160206
Completion Status:
64%
GN-2015B-Q-101 Lundquist US Near-Infrared Spectroscopy of IMSFRs in the Inner Galaxy Flamingos2 / GNIRS 22.10
Execution Status: Dates Taken:
20151104 20151113 20151128 20151210 20151219 20151220 20151227 20151228 20160110
Completion Status:
37%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:21:48 GMT