[Mayan calendar]

Poor Weather Queue Summary : Semester 2015A GN

The queues shown in the tables below summarise the programs that constitute the "Poor Weather Queue" on GN. The Poor Weather Queue is a pilot program introduced in 2006B to fill telescope time under very poor, but usable, conditions. These programs are distinct from other queue programs in three important ways: 1) time spent on poor weather programs will not be charged to the PIs or the partner countries; 2) poor weather programs can exist in queue only, and must meet the observing condition constraints shown below; and 3) poor weather programs are lower priority than the "regular" queue (bands 1 to 3) and have no explicit or implicit guarantee of being observed. They will be executed only when nothing in the regular queue is observable.

In all other respects — NGO and Gemini contact scientist support, Phase II definitions, Gemini Science Archive data distribution — programs in the Poor Weather Queue are similar to all other Gemini queue programs. In the Observing Tool, poor weather queue programs are designated as Band 4, to distinguish them from the rest of the queue.

Observing condition constraints for poor weather programs must meet one of the following:

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2015A-Q-99 Schirmer US Redshift survey of field galaxies around AGN ionization echoes GMOS / GMOS-S 8.00
Execution Status: Dates Taken:
20150528 20150704 20150706 20150707 20151105 20151108 20151227 20160123
Completion Status:
83%
GN-2015A-Q-401 Placco GS Identifying Bright CEMP Stars in the RAVE Catalog GMOS / GMOS-S 30.00
Execution Status: Dates Taken:
20150125 20150130 20150202 20150228 20150316 20150403 20150408 20150424 20150429 20150510 20150512 20150513 20150520 20150527 20150528 20150615 20150616 20150729
Completion Status:
86%
GN-2015A-Q-402 Geballe GS Additional Probes of the Galactic Center's Interstellar Medium - continuation GNIRS 30.00
Execution Status: Dates Taken:
20150511 20150615
Completion Status:
5%
GN-2015A-Q-403 Petric UH Estimating the Star Formation Histories of Obscured Quasars at Redshift ~ 2 GNIRS 12.00
Execution Status: Dates Taken:
20150519 20150520 20150706
Completion Status:
27%
GN-2015A-Q-404 Oio GS Feedback in Narrow-Line Seyfert 1 Galaxies: unveiling the nuclear complex kinematics and star formation in SDSS J112813.02+102308.3 GMOS 9.60
Execution Status: Dates Taken:
Completion Status:
0%
GN-2015A-Q-405 Weidmann AR Central Stars of Planetary Nebulae: Survey for Spectral Classification GMOS / GMOS+AltairLGS 6.10
Execution Status: complete Dates Taken:
20150429 20150430 20150510 20150512 20150513 20150605 20150607 20150615 20150617
Completion Status:
100%
GN-2015A-Q-406 Koljonen GS The nature of the binary components in enigmatic microquasar Cyg X-3 GNIRS 11.00
Execution Status: complete Dates Taken:
20150613 20150614 20150616 20150617 20150629 20150704 20150706 20150729 20151105
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:21:48 GMT