The queues shown in the tables below summarise the programs that constitute the "Poor Weather Queue" on GN. The Poor Weather Queue is a pilot program introduced in 2006B to fill telescope time under very poor, but usable, conditions. These programs are distinct from other queue programs in three important ways: 1) time spent on poor weather programs will not be charged to the PIs or the partner countries; 2) poor weather programs can exist in queue only, and must meet the observing condition constraints shown below; and 3) poor weather programs are lower priority than the "regular" queue (bands 1 to 3) and have no explicit or implicit guarantee of being observed. They will be executed only when nothing in the regular queue is observable.

In all other respects — NGO and Gemini contact scientist support, Phase II definitions, Gemini Science Archive data distribution — programs in the Poor Weather Queue are similar to all other Gemini queue programs. In the Observing Tool, poor weather queue programs are designated as Band 4, to distinguish them from the rest of the queue.

Observing condition constraints for poor weather programs must meet one of the following:

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2014B-Q-102 Beers BR Missing metal-poor stars from the HK and Hamburg/ESO Surveys (North) GMOS 30.00
Execution Status: complete Dates Taken:
20140712 20141031 20141104 20141106 20141108 20141120 20141122 20141129 20141204 20141205 20141206 20141211 20141214 20141217 20141220 20141222 20150107 20150113
Completion Status:
100%
GN-2014B-Q-105 FLAGEY UH To Be or nor to B[e] a LBV GNIRS 10.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2014B-Q-106 Maille GS Spectroscopy of Very High Redshift Blazars GNIRS+Altair 0.60
Execution Status: Dates Taken:
Completion Status:
0%
GN-2014B-Q-107 Hillwig GS A Spectroscopic Search for Companions to Planetary Nebula Central Stars GMOS 18.50
Execution Status: Dates Taken:
20141111 20141122 20141129 20141206 20141214 20141219 20150107 20150125 20150130
Completion Status:
44%
GN-2014B-Q-108 Shih GS Extended Outflows From Low-Excitation AGNs? GMOS 16.00
Execution Status: Dates Taken:
20141122 20141216 20141217 20141220 20150112 20150113 20150125
Completion Status:
43%
GN-2014B-Q-109 Chené GS Twinkle little star, how I wonder where you are. GNIRS+Altair / NIRI+Altair 0.34
Execution Status: complete Dates Taken:
20141204 20141211
Completion Status:
100%
GN-2014B-Q-110 Arias AR Be stars: circumstellar environment variability through hydrogen emission lines in the near IR GNIRS 1.40
Execution Status: Dates Taken:
Completion Status:
0%

 

[Science Operations home] [schedules home]