[Mayan calendar]

Poor Weather Queue Summary : Semester 2014A GN

The queues shown in the tables below summarise the programs that constitute the "Poor Weather Queue" on GN. The Poor Weather Queue is a pilot program introduced in 2006B to fill telescope time under very poor, but usable, conditions. These programs are distinct from other queue programs in three important ways: 1) time spent on poor weather programs will not be charged to the PIs or the partner countries; 2) poor weather programs can exist in queue only, and must meet the observing condition constraints shown below; and 3) poor weather programs are lower priority than the "regular" queue (bands 1 to 3) and have no explicit or implicit guarantee of being observed. They will be executed only when nothing in the regular queue is observable.

In all other respects — NGO and Gemini contact scientist support, Phase II definitions, Gemini Science Archive data distribution — programs in the Poor Weather Queue are similar to all other Gemini queue programs. In the Observing Tool, poor weather queue programs are designated as Band 4, to distinguish them from the rest of the queue.

Observing condition constraints for poor weather programs must meet one of the following:

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2014A-Q-104 Jorgensen GS Galaxy Evolution in the Densest Environments: Abell 2029 and Abell 2142 GMOS 40.00
Execution Status: Dates Taken:
20140310 20140312 20140317 20140321 20140408 20140418 20140419 20140421 20140422 20140425 20140427 20140705 20140706 20140707 20140715
Completion Status:
68%
GN-2014A-Q-105 Beers US Missing metal-poor stars from the HK and Hamburg/ESO Surveys (North) GMOS 33.30
Execution Status: complete Dates Taken:
20140325 20140406 20140407 20140408 20140412 20140414 20140415 20140418 20140419 20140420 20140425 20140427 20140428 20140705 20140707 20140709
Completion Status:
100%
GN-2014A-Q-106 Mason GS NIR spectroscopy of supermassive back holes in local dwarf galaxies GNIRS / GNIRS+AltairLGS 8.00
Execution Status: Dates Taken:
20140312 20140314 20140318 20140324 20140708
Completion Status:
78%
GN-2014A-Q-107 Weidmann AR Determining the actual nature of weak emission line stars in the nucleus of Planetary Nebulae GMOS 4.80
Execution Status: complete Dates Taken:
20140318 20140420 20140427 20140428 20140503 20140707 20140708
Completion Status:
100%
GN-2014A-Q-108 Geballe GS Additional Probes of the Galactic Center's Interstellar Medium - continuation GNIRS 27.00
Execution Status: Dates Taken:
20140407 20140412 20140413 20140414 20140415 20140422 20140423 20140427 20140704 20140705 20140707 20140708
Completion Status:
40%
GN-2014A-Q-109 Petric GS Warm Gas and Dust in Powerful Nearby AGN GNIRS 4.20
Execution Status: Dates Taken:
20140715 20141120 20141220
Completion Status:
100%
GN-2014A-Q-110 Lucas GS The incidence of eruptive variability in star formation regions NIFS 17.80
Execution Status: Dates Taken:
20141002
Completion Status:
5%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:21:48 GMT