[Mayan calendar]

Poor Weather Queue Summary : Semester 2010A GN

The queues shown in the tables below summarise the programs that constitute the "Poor Weather Queue" on GN. The Poor Weather Queue is a pilot program introduced in 2006B to fill telescope time under very poor, but usable, conditions. These programs are distinct from other queue programs in three important ways: 1) time spent on poor weather programs will not be charged to the PIs or the partner countries; 2) poor weather programs can exist in queue only, and must meet the observing condition constraints shown below; and 3) poor weather programs are lower priority than the "regular" queue (bands 1 to 3) and have no explicit or implicit guarantee of being observed. They will be executed only when nothing in the regular queue is observable.

In all other respects — NGO and Gemini contact scientist support, Phase II definitions, Gemini Science Archive data distribution — programs in the Poor Weather Queue are similar to all other Gemini queue programs. In the Observing Tool, poor weather queue programs are designated as Band 4, to distinguish them from the rest of the queue.

Observing condition constraints for poor weather programs must meet one of the following:

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2010A-Q-105 van den Bosch CA Beyond SAURON: A GMOS/IFU Study of Early-Type Dwarf Galaxies in the Virgo Cluster GMOS 20.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2010A-Q-106 Stockton UH Spectroscopy of Candidate Low-Redshift Analogs of Compact, Massive Early-Type Galaxies at High Redshifts GMOS 4.32
Execution Status: Dates Taken:
20100314 20100316 20100424
Completion Status:
15%
GN-2010A-Q-107 Robert CA Star formation history in barred spiral galaxies: NGC 5430 GMOS 22.00
Execution Status: Dates Taken:
20100201
Completion Status:
0%
GN-2010A-Q-108 Laycock GS The Role of Close Companions in Be-Star Disk Formation. NIRI / NIRI+Altair 8.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2010A-Q-109 Geballe GS Additional probes of the Galactic center's interstellar medium NIRI 17.00
Execution Status: Dates Taken:
20100610
Completion Status:
8%
GN-2010A-Q-110 Dieters AU Orbital Changes of the Hot Neptune of GJ436 GMOS 7.70
Execution Status: Dates Taken:
Completion Status:
0%
GN-2010A-Q-111 Clayton US Z Umi: A Critical Test of the formation paths of R Coronae Borealis Stars NIRI 0.60
Execution Status: Dates Taken:
Completion Status:
0%
GN-2010A-Q-112 Schiavon GS Gemini Library of InfraRed Stellar Spectra NIFS 20.00
Execution Status: Dates Taken:
20100323 20100329 20100330 20100331 20100401 20100404 20100410 20100415 20100423 20100428 20100429 20100502 20100503 20100520 20100521 20100523 20100524 20100527 20100528 20100601 20100602 20100609 20100623
Completion Status:
96%
GN-2010A-Q-113 Schimoia BR Broad double-peaked Halpha profiles from LINER nuclei GMOS 6.00
Execution Status: Dates Taken:
20100524 20100528 20100601 20100608
Completion Status:
97%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:21:48 GMT