You are here

2022B GS Poor Weather Programs

Content owned by bcooper

The table below summarizes the Gemini South queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [22B] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2022B-Q-401 Ahumada AR Integrated spectroscopy of LMC star clusters GMOS-S 26.45
Execution Status: Dates Taken:
20220908 20220918
Completion Status:
0%
GS-2022B-Q-402 Rodriguez AR Looking for elusive companions in massive binaries Visitor 6.14
Execution Status: Dates Taken:
Completion Status:
0%
GS-2022B-Q-403 Weidmann AR Providing quality data from probable planetary nebulae GMOS-S 28.10
Execution Status: Dates Taken:
20220919 20220922 20220926 20220927 20220928
Completion Status:
8%
GS-2022B-Q-404 Lima US GMOS spectroscopy of intermediate polar SWIFT J183221.56-162724.257 GMOS-S 1.00
Execution Status: Dates Taken:
20220904 20220910 20220912 20220914 20220924
Completion Status:
100%
GS-2022B-Q-405 Seccull US A Search for Fainter Solar Calibrators GMOS / GMOS-S 37.70
Execution Status: Dates Taken:
20220908 20220912 20220918 20220926 20220927 20220928
Completion Status:
34%
GS-2022B-Q-406 Sodre Jr BR Search for Ultra Compact Dwarfs in the Fornax Cluster of Galaxies GMOS-S 12.60
Execution Status: Dates Taken:
20220910 20220918 20220927
Completion Status:
0%
GS-2022B-Q-407 Cartier GS Constraining the progenitor of the peculiar SN 2022jli through nebular phase observations Flamingos2 / GMOS-S 27.95
Execution Status: Dates Taken:
Completion Status:
0%