You are here

2021A GS DDT Programs

Content owned by bmiller

The table below summarizes the Gemini North queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [21B] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2021A-DD-101 Seccull DD A Clearer Look at Trans-Neptunian Asteroid 2004 EW95 GMOS-S 2.40
Execution Status: complete Dates Taken:
20210313
Completion Status:
100%
GS-2021A-DD-102 Soraisam DD AT2020caa: a unique supernova or an unknown unknown? GMOS-S 1.10
Execution Status: complete Dates Taken:
20210218 20210219
Completion Status:
100%
GS-2021A-DD-103 Johnstone DD Confirmation of a rare FUor outburst in Orion Visitor 2.00
Execution Status: complete Dates Taken:
20210306
Completion Status:
100%
GS-2021A-DD-104 Gully-Santiago DD Disentangling condensate clouds with contemporaneous IGRINS and TESS monitoring Visitor 2.40
Execution Status: complete Dates Taken:
20210312 20210313 20210314 20210318
Completion Status:
100%
GS-2021A-DD-105 Ridden-Harper DD The first detailed atmospheric characterization of an exceptional new Earth-sized world Visitor 2.70
Execution Status: complete Dates Taken:
20210503 20210525
Completion Status:
100%
GS-2021A-DD-106 Guolo Pereira DD Optical follow-up of the recent transition in the ‘Changing Look’ AGN NGC2992 GMOS-S 0.70
Execution Status: complete Dates Taken:
20210418 20210420
Completion Status:
100%
GS-2021A-DD-107 AYDI DD TOWARDS A UNIVERSAL SCENARIO FOR SHOCK FORMATION IN NOVAE GMOS-S 2.50
Execution Status: complete / SToO Dates Taken:
20210617 20210618 20210619 20210620 20210627 20210701 20210704 20210707 20210709
Completion Status:
100%
GS-2021A-DD-108 Kilic DD A Search for Eclipses in A New Gravitational Wave Source GMOS-S 1.20
Execution Status: complete Dates Taken:
20210628
Completion Status:
100%
GS-2021A-DD-109 Hui DD A Remarkable Inbound Oort Cloud Comet at Record Heliocentric Distance GMOS-S 0.90
Execution Status: complete Dates Taken:
20210712
Completion Status:
100%
GS-2021A-DD-110 Levan DD A kilonova candidate at 100 Mpc Flamingos2 / GMOS / NIRI 3.50
Execution Status: complete / SToO Dates Taken:
20210707 20210708 20210810 20210811 20210812 20210827 20210828
Completion Status:
100%
GS-2021A-DD-111 Ridden-Harper US The first detailed atmospheric characterization of an exceptional new Earth-sized world Visitor 2.70
Execution Status: Dates Taken:
Completion Status:
0%
GS-2021A-DD-112 Ighina DD Spectroscopic confirmation of two z>6 Radio-Loud Quasar candidates GMOS-S 3.90
Execution Status: complete Dates Taken:
20210809 20210812 20211007 20211014 20211015
Completion Status:
100%