- PIO
- Sciops
- Gemini Home
- Telescopes and Sites
- Science Visitors at Gemini
- Observing With Gemini
- Instruments
- NORTH
- ALTAIR
- GMOS
- GNIRS
- NIFS
- NIRI
- SOUTH
- FLAMINGOS-2
- GeMS
- GMOS
- GPI
- GSAOI
- NICI
- VISITING
- Visiting Instrument Policy
- DSSI Speckle Camera (North)
- TEXES (North)
- RESOURCES
- Integration Time Calculators
- Adaptive Optics
- GCAL
- Magnitudes and Fluxes
- Near-IR Resources
- Mid-IR Resources
- Observing Condition Constraints
- Performance Monitoring
- SV/Demo Science
- Future Instrumentation
- Queue and Schedules
- Data and Results
- Helpdesk
- Statistics
Change page style:
Calibrations
This page describes the suite of calibration frames routinely taken
for GSAOI. Applicants are encouraged to review the information in the
instrument and GeMS pages in order to understand the level of precision
that can be achieved with the standard set of calibrations.
Applicants should not include time for baseline calibrations in their Phase I proposals. If additional calibrations are deemed necessary, for example to achieve a precision beyond that provided by the baseline set, then these must be included explicitly as part of the Phase I proposal and Phase II science program. Any time used between the hours of nautical sunset and sunrise to obtain baseline calibrations will not be explicitly charged to the program but will be charged to the partner country whose NTAC recommended time (i.e. it is part of the time accounting used to balance partner usage). The time will be charged in proportion to the number of programs that receive the calibration data. Any time required for additional calibrations requested by the PI will be charged to that particular program.
Baseline calibrations will be obtained for all observations, and shared between programs. GSAOI calibrations will be distributed to the users through the Gemini Science Archive (GSA). Instructions are given below on how to retrieve the baseline calibrations required for a program. Calibrations requested outside the baseline set will be included with the program data.