Gemini Documentation - Technical Notes
- TN-O-G0002. Report on Deformation of the Primary Mirror Cell and its Effect on Mirror Figure, 22-Jan-93 (PS) (PDF)
- TN-O-G0003. Effects on Surface Figure Due to Random Error in Support Actuator Forces, 22-Feb-93 (PS) (PDF)
- TN-O-G0004. Optical Surface Figure Evaluation of an 8m Primary Mirror, 20-Dec-92 (PS) (PDF)
- TN-O-G0005. Optimum Final Surface Configuration of an 8m Meniscus Mirror Using First and Third Order..., 18-Sep-92 (PS) (PDF)
- TN-C-G0006. Chopping Secondary Control Study, 12-Apr-93 (PDF)
- TN-C-G0007. A Method for Determining Tip-Tilt Secondary Bandwidth & Power Requirements, 08-Apr-93 (PS) (PDF)
- TN-C-G0008. Image Smear Error Budget with Required Servo Bandwidth & Sampling Rate, 25-May-93 (PS) (PDF)
- TN-C-G0009. Visual Scientific Development & Control Environments, 21-Jun-93 (PS) (PDF)
- TN-S-G0010. Primary Mirror F/# Trades - Technical Assessments, 2-Jul-93 (PS) (PDF)
- TN-C-G0011. Restriction Imposed on Tip-Tilt for an Off-Axis Guide Star, 23-Aug-93 (PS) (PDF)
- TN-C-G0012. SNR vs. Sample Rate for Tip-Tilt Using and Off-Axis Guide Star, 23-Aug-93 (PS) (PDF)
- TN-C-G0013. Windshake vs. Sample Rate and Centroid Error vs. Sample Rate for Tip-Tilt Using an..., 19-Aug-93 (PS) (PDF)
- TN-C-G0015. Summary of Gemini Control Simulations, 09-Sep-93 (PDF)
- TN-TE-G0016. Support Facility Roof Thermal Analysis, 14-Oct-93 (PS) (PDF)
- TN-O-G0017. Line of Sight Sensitivity Equations, 1-Dec-93 (PS) (PDF)
- TN-TE-G0018. Coating Removal Processes for an 8m Mirror, 1-Feb-94 (PS) (PDF)
- TN-O-G0019. Mirror Support Design Issues Related to the [REOSC] Metrology Mount, 1-Jun-94 (PS) (PDF)
- TN-PS-G0020. A Scientific Perspective on the Requirements for the 1-5 Micron Spectrograph, 01-Jul-94.
- TN-I-G0021. Fiber evaluation for Gemini Design Parameters, 13-Jun-91 (PS) (PDF)
- TN-C-G0022. Gemini Nonlinear Servo Simulations, 06-Oct-94 (PDF)
- TN-I-G0023. Stray radiation issues in astronomical systems with adaptive optics (PS) (PDF)
- TN-PS-G0024. Availability of Digital Sky Surveys for Gemini, 1-Mar-95 (PS) (PDF)
- TN-PS-G0025. Comparison of CFHT/CfA Seeing Measurements, 1-Aug-94 (PS) (PDF)
- TN-PS-G0026. Tolerance on Chop Timing, 5-Oct-94 (PS) (PDF)
- TN-PS-G0027. Analysis of Offset Errors on Reconstructed Dithered Images, 25-Aug-94 (PS) (PDF)
- TN-PS-G0028. Impact of Telescope Offset Errors on Slit Throughput, 6-Sep-94 (PS) (PDF)
- TN-PS-G0029. The Use of the Hipparcos Catalog as Gemini's Pointing Basis, 1-Jul-95 (PS) (PDF)
- TN-PS-G0030. Longitudinally Averaged R-Band Field Star Counts Across the Entire Sky, 31-Jul-95 (PS) (PDF)
- TN-PS-G0031. Near-IR Wavefront Sensing, 1-Aug-95 (PS) (PDF)
- TN-PS-G0032. Remote Sensing of Atmospheric Emissivity over Mauna Kea Using Satellite Imagery, 1-Sep-95 (PS) (PDF)
- TN-PS-G0033. Availability of Infrared Guide Stars in Dark Clouds, 11-Oct-95 (PS) (PDF)
- TN-PS-G0034. Science Perspective of the Mid-IR Imager Performance Requirements, 22-Dec-95 (PS) (PDF)
- TN-S-G0035. Technical Note on a Proposed Wavefront Sensing Field Scan and Relay Optic Concept, 19-Dec-95 (PS) (PDF)
- TN-PS-G0036. Integral Field Spectroscopy with the Gemini Near-Infrared Spectrograph, 1-Jan-96 (PS) (PDF)
- TN-PS-G0037. Near Infrared Filter Bandpasses for Gemini Instruments, 1-Mar-96 (PS) (PDF)
- TN-C-G0038. Security in the Gemini System, 15-Mar-96 (PS) (PDF)
- TN-PS-G0039. Scientific Perspectives on Gemini Data Reduction, 26-Mar-96 (PS) (PDF)
- TN-C-G0040. Prediction of Servo Error Using Simulink Model, 12-Apr-96 (PDF)
- TN-C-G0041. Encoder Tests, 10-Jul-96 (PS) (PDF)
- TN-PS-G0042. Near Infrared Filter Manufacturing Specifications for Gemini Instruments, 30-Aug-96 (PS) (PDF)
- TN-PS-G0043. Operations Science Use Scenario, 30-Sep-96 (PS) (PDF)
- TN-PS-G0044. Pointing Algorithms (PS) (PDF)
- TN-PS-G0045. Astronomical Coordinate Frames (PS) (PDF)
- TN-C-G0046. Wind Spectra for Gemini, 30-Dec-96 (PDF)
- TN-PS-G0048. Nightly data storage requirements for Gemini instruments, 1-Jan-97 (PS) (PDF)
- TN-PS-G0049. Scientific User Requirements for the Gemini Phase I Applications Tool 1-Mar-97 (PS) (PDF)
- TN-PS-G0050. Site Monitoring of the Gemini Telescopes, 1-May-97
- TN-PS-G0051. Use of Gemini for a Short, Quick Response to Time Critical Observations, 2-Jun-97 (PS) (PDF)
- TN-PS-G0052. Basic Assembly and Use of the Cerro Pachon Weather Station, 1-Jul-97 (PS) (PDF)
- TN-C-G0053. Health and Alarms, 01-Aug-97 (PS) (PDF)
- TN-I-G0054. Self-learning Bayesian centroid estimation, 6-Aug-97 (PS) (PDF)
- TN-C-G0055. Writing EPICS Device Support, 10-Nov-97 (PS) (PDF)
- TN-PM-G0056. Comments on the Early Work at KPNO and NOAO on Giant Telescopes, May-98.
- TN-O-G0057. Plan for Empirical Calibration of the Adaptive Optics System, 11-Mar-99.
Ruth A. Kneale / web@gemini.edu / February 28, 2000